Buscar
Mostrando ítems 1-10 de 155
ACO-based dynamic job scheduling of parametric computational mechanics studies on Cloud Computing infrastructures
(IOS Press, 2013)
Parameter Sweep Experiments (PSEs) allow scientists to perform simulations by running the same code with different input data, which typically results in many CPU-intensive jobs and thus computing environments such as ...
Minimizing Total Weighted Tardiness on a Batch-Processing Machine with Non-Identical Job Sizes and Non-Zero Ready Times
(Institute of Industrial Engineers ( IIE ), 2011-05-25)
This research was motivated by a practical application observed at an electronics manufacturing facility in which meeting customer due dates is the primary objective. Each job to be scheduled is defined by its processing time
Applying MILP/Heuristic Algorithms to Automated Job-Shop Scheduling Problems in Aircraft-Part Manufacturing
(Universidad Federal de Santa Catarina. Centro Tecnológico. Programa de Postgrado en Ingeniería de Producción, 2014-04)
This work presents efficient algorithms based on Mixed-Integer LinearProgramming (MILP) and heuristic strategies for complex job-shop scheduling problemsraised in Automated Manufacturing Systems. The aim of this work is ...
Production scheduling and lot streaming at flexible job-shops environments using constraint programming
(Pergamon-Elsevier Science Ltd, 2019-10)
In this contribution, the scheduling at flexible job-shops and the lot streaming problem are simultaneously addressed, by means of a novel Constraint Programming (CP) approach. The proposed CP model can efficiently tackle ...
Schedulers based on Ant Colony Optimization for Parameter Sweep Experiments in Distributed Environments
(International Gemological Institute, 2013)
Scientists and engineers are more and more faced to the need of computational power to satisfy the ever-increasing resource intensive nature of their experiments. An example of these experiments is Parameter Sweep Experiments ...
Scheduling a Job Shop with a BPM Using Simulated Annealing. Proceedings of Industrial Engineering Research Conference (ISERC)
(Inst of Industrial Engineers; Cdr edition, 2012-05-23)
We consider a scheduling problem commonly observed in the metal working industry. We analyze a job shop which is equipped with one batch processing machine (BPM)