dc.creatorMaturana, Sergio
dc.creatorPizani, Enzo
dc.creatorVera, Jorge
dc.date.accessioned2024-01-10T12:42:19Z
dc.date.accessioned2024-05-02T16:15:13Z
dc.date.available2024-01-10T12:42:19Z
dc.date.available2024-05-02T16:15:13Z
dc.date.created2024-01-10T12:42:19Z
dc.date.issued2010
dc.identifier10.1016/j.cie.2010.07.016
dc.identifier1879-0550
dc.identifier0360-8352
dc.identifierhttps://doi.org/10.1016/j.cie.2010.07.016
dc.identifierhttps://repositorio.uc.cl/handle/11534/77502
dc.identifierWOS:000284747000021
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/9265944
dc.description.abstractSawmill production scheduling is complex. It involves determining which logs to process taking into account the diameter, length, and grade of each log, on one hand, and the finished products that are needed to fulfill the orders, on the other. The cutting pattern determines which products are generated and also the yield, which is how much of the volume of the log ends as finished products. We used two approaches to solve the problem: a mathematical model, which calculates the volume and the schedule of various types of logs, and a heuristic that solves the problem by systematically applying the criteria used by a sawmill programmer in southern Chile. We compare the results of using both approaches under various scenarios in a 6 week planning horizon, with the mathematical model showing a superior performance in almost all instances except two, were both found the optimal solution. The proposed mathematical model can be solved in a relatively short time, which makes it a suitable basis of a practical optimization-based decision support system. (C) 2010 Elsevier Ltd. All rights reserved.
dc.languageen
dc.publisherPERGAMON-ELSEVIER SCIENCE LTD
dc.rightsacceso restringido
dc.subjectScheduling
dc.subjectSawmill
dc.subjectForestry
dc.subjectOptimization
dc.subjectHeuristic
dc.subjectMASTER PRODUCTION SCHEDULE
dc.subjectSUPPLY CHAIN MANAGEMENT
dc.subjectOPTIMIZATION
dc.subjectPROGRAM
dc.subjectSETUPS
dc.subjectYIELD
dc.titleScheduling production for a sawmill: A comparison of a mathematical model versus a heuristic
dc.typeartículo


Este ítem pertenece a la siguiente institución