dc.contributor | Smith Cornejo, Neale Ricardo | |
dc.contributor | Escuela de Ingeniería y Ciencias | |
dc.contributor | Tercero Gómez, Víctor G | |
dc.contributor | Ángel Bello Acosta, Francisco R | |
dc.contributor | Campus Monterrey | |
dc.contributor | lagdtorre/tolmquevedo | |
dc.creator | De la Torre Altamirano, Mario Alejandro | |
dc.date.accessioned | 2021-11-12T20:25:42Z | |
dc.date.accessioned | 2022-10-13T21:16:29Z | |
dc.date.available | 2021-11-12T20:25:42Z | |
dc.date.available | 2022-10-13T21:16:29Z | |
dc.date.created | 2021-11-12T20:25:42Z | |
dc.date.issued | 2020-06-15 | |
dc.identifier | De la Torre Altamirano, M. A. (2020). Price and due date quoting for a mass customization company.(Tesis de Maestría). Instituto Tecnológico y de Estudios Superiores de Monterrey. Recuperado de: https://hdl.handle.net/11285/641155 | |
dc.identifier | https://hdl.handle.net/11285/641155 | |
dc.identifier | 919505 | |
dc.identifier.uri | https://repositorioslatinoamericanos.uchile.cl/handle/2250/4218883 | |
dc.description.abstract | Mass customization is a competitive strategy based on offering a wide variety of
options without greatly increasing production costs. Some associated challenges are
the management of components inventory and job scheduling. Three unique
scheduling mixed integer programming models with sequence dependent setups are
proposed for different production scenarios. They allow quoting different sale prices
depending on what due date is acceptable to the customer. Three solutions methods
were employed, one is a mixed integer programming formulation with the Gurobi
optimizer solver, which guarantees to find the optimal solution, but is restricted to the
problem size. The others are a simulated annealing and an ant colony heuristic,
which does not guarantee to find the optimal answer, but is not restricted by the size
of the problem. Both heuristics probe to bring statistically similar results. Each
solution method was successfully validated on a real-world mass customization firm.
Due date variation analysis showed a high correlation between due date and cost.
Model can be meaningfully used since long lead time can be a major cause for
market share loss. | |
dc.language | eng | |
dc.publisher | Instituto Tecnológico y de Estudios Superiores de Monterrey | |
dc.relation | versión publicada | |
dc.relation | 2020-06-15 | |
dc.rights | http://creativecommons.org/licenses/by-nc-nd/4.0 | |
dc.rights | openAccess | |
dc.title | Price and due date quoting for a mass customization company | |
dc.type | Tesis de Maestría / master Thesis | |