dc.contributorGodoy, Leoni Pentiado
dc.contributorhttp://lattes.cnpq.br/7499692835204617
dc.contributorSilva, Andrey Ricardo da
dc.contributorhttp://lattes.cnpq.br/0011565883560592
dc.contributorGomes, Clandia Maffini
dc.contributorhttp://lattes.cnpq.br/2010827580929023
dc.contributorEvangelista, Mário Luiz Santos
dc.contributorhttp://lattes.cnpq.br/1880377231722847
dc.creatorGuarienti, Édio Patric
dc.date.accessioned2013-11-12
dc.date.available2013-11-12
dc.date.created2013-11-12
dc.date.issued2013-02-22
dc.identifierGUARIENTI, édio Patric. ANALYSIS AND DEVELOPMENT OF A DECISION MODEL IN PRODUCTION ENVIRONMENT WITH MULTI-PROJECT MANAGEMENT. 2013. 92 f. Dissertação (Mestrado em Engenharia de Produção) - Universidade Federal de Santa Maria, Santa Maria, 2013.
dc.identifierhttp://repositorio.ufsm.br/handle/1/8270
dc.description.abstractThis dissertation aims to develop a decision model for sequencing production activities to optimize the delivery time of projects. The survey classify him as applied and descriptive with qualitative and quantitative approach, having how the procedure the single case study. To develop the decision model was used the process flow map to identify the critical control points and determining the evaluation and priorization criteria of project activities for each subprocess. After, it were measured all evaluation criteria identified by mathematical formulas and it was subsequently drafted a simulation tool for priorization and decision on multiple projects to sequence the production activities. The base-building of simulation tool was the Microsoft Excel® software application. The tool was used in a lower hierarchical level to identify the projects to be executed with better success, aiming to maximize revenue. The model was tested in a electromechanical industry located in northwest of Rio Grande do Sul, where it was randomly selected six projects with engineering and custom manufacturing(ETO and MTO) among twenty projects that are executed in average per month. As a result, it was obtained the projects analyzed according to criteria adopted, which should be prioritized in production without compromising delivery time to the customer and the earnings of the company. Therefore, one can conclude that the tool can assist in prioritization of project execution type (ETO and MTO).
dc.publisherUniversidade Federal de Santa Maria
dc.publisherBR
dc.publisherEngenharia de Produção
dc.publisherUFSM
dc.publisherPrograma de Pós-Graduação em Engenharia de Produção
dc.rightsAcesso Aberto
dc.subjectProjetos industriais
dc.subjectPortfólio de projetos
dc.subjectMúltiplos projetos
dc.subjectPriorização
dc.subjectTomada de decisão
dc.subjectFerramentas de auxílio à decisão
dc.subjectProjects industries
dc.subjectProject portfolio
dc.subjectMultiple projects
dc.subjectPrioritization
dc.subjectDecision making
dc.subjectTools to aid the decision
dc.titleAnálise e desenvolvimento de um modelo de decisão em ambiente de produção com gestão de múltiplos projetos
dc.typeDissertação


Este ítem pertenece a la siguiente institución