Tese
Metodologia de planejamento e controle da produção para obras de engenharia natural
Fecha
2019-02-18Autor
Sousa, Rita dos Santos
Institución
Resumen
Soil Bioengineering consists of a group of techniques that combine live construction materials
with inert materials which can be applied as constructive solutions to structural problems of
geotechnical and hydraulic stabilization, control surface erosion processes, and
simultaneously designs ecosystems in dynamic equilibrium. In Soil Bioengineering works are
not used performance assessment procedures standardized, through methodologies. The
production planning and control are informally conducted in an empirically and subjectively
way. With the increasing worldwide use of these techniques, the level of customer requirement,
the limited availability of financial resources for works execution and competition between
companies comes up the need for the development of a standardized system for management
of Soil Bioengineering works, particularly at the level of the production planning and control
(PCP). Taking these issues into consideration, the aim of this work is to develop a methodology
of PCP for Soil Bioengineering works, considering the concepts and principles of lean
construction. A methodology was developed with the integration of three hierarchical levels:
strategic, tactical and operational and was specified a system of key performance indicators
adapted to the specificities of Soil Bioengineering. Afterwards, the methodology was validated
through the practical application to a work performed in Brazil. The developed methodology
promoted the application of the lean construction principles. Had focus on the effectiveness of
the work execution process, according to the term and the programmed sequence, increasing
the reliability of production, greater visibility in relation to the expectation of work conclusion,
as well as, the identification of causes of deviations that interfered with work execution and the
increased efficiency in the use of resources. The proposed PCP model can be considered as
an integration tool between the company different management functions, especially regarding
the mitigation of the losses in the production process associated with the costs, deadlines or
quality, providing consistency, transparency and rationality in the collection and dissemination
of information within the organization. The design, implementation and use of key indicators
system for performance measurement in Soil Bioengineering works is innovative at an
international level. The proposed PCP and key performance indicators promoted the
understanding of the results and deviation causes, supporting the decision-making process
and the implementation of corrective measures that aim continuous improvement of the
process and of the organization as a whole. The proposed model may change as learning
process, consolidation of concepts and continuous improvement occur in the company. In this
case new methods, procedures, techniques or key performance indicators can be established.