dc.creatorCampos, P. H. A
dc.creatorArroyo, C. E.
dc.creatorMorales, N.
dc.date.accessioned2018-09-25T19:49:28Z
dc.date.available2018-09-25T19:49:28Z
dc.date.created2018-09-25T19:49:28Z
dc.date.issued2018-04
dc.identifierJournal of the Southern African Institute of mining and metallurgy Volumen: 118 Número: 4 Páginas: 381-386
dc.identifier10.17159/2411-9717/2018/v118n4a8
dc.identifierhttps://repositorio.uchile.cl/handle/2250/151757
dc.description.abstractMany papers have been published by the scientific community on the development of techniques that use direct block scheduling (DBS) to solve open pit production scheduling problems, and have compared the results obtained with DBS to those obtained with conventional methods for mine planning. The most significant advantage of using DBS is the possibility of maximizing the economic value to each project. However, until recently, the computational complexity of DBS has prevented it from being used to solve problems on an industrial scale, where there are a large number of mine blocks to deal with and many constraints. While much research has already been conducted and many new and algorithms have been developed to solve this global open pit production-scheduling problem, this article proposes the use of optimized models obtained through DBS as part of the conventional medium-term planning methodology to take advantage of its benefits hout bein hindered by its limitations. Three different approaches to medium-term planning were compared First, a renowned software package that is used in the mineral industry was used to execute conventional medium-term scheduling. Then, DBS was used to perform the same task. Finally, a combination of DBS and conventional scheduling was tested. Using the results provided by DBS, sectorization of specific areas was included in the conventional methodology to guide the scheduling and thus allow this combination to produce real benefits, even for large projects.
dc.languageen
dc.publisherSouthern African INST. Mining Metallurgy
dc.rightshttp://creativecommons.org/licenses/by-nc-nd/3.0/cl/
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 Chile
dc.sourceJournal of the Southern African Institute of mining and metallurgy
dc.subjectBlock scheduling
dc.subjectOpen pit mining
dc.subjectMine planning
dc.subjectProduction scheduling
dc.titleApplication of optimized models through direct block scheduling in traditional mine planning
dc.typeArtículo de revista


Este ítem pertenece a la siguiente institución