dc.creatorKonstantelos, Ioannis
dc.creatorMoreno Vieyra, Rodrigo
dc.creatorStrbac, Goran
dc.date.accessioned2018-05-25T15:02:45Z
dc.date.accessioned2019-04-26T01:34:12Z
dc.date.available2018-05-25T15:02:45Z
dc.date.available2019-04-26T01:34:12Z
dc.date.created2018-05-25T15:02:45Z
dc.date.issued2017
dc.identifierEnergy Economics 64 (2017) 131–148
dc.identifier10.1016/j.eneco.2017.03.022
dc.identifierhttp://repositorio.uchile.cl/handle/2250/148133
dc.identifier.urihttp://repositorioslatinoamericanos.uchile.cl/handle/2250/2452177
dc.description.abstractThe notion of developing a transnational offshore grid in the North Sea has attracted considerable attention in the past years due to its potential for substantial capital savings and increased scope for cross-border trade, sparking a European-wide policy debate on incentivizing integrated transmission solutions. However, one important aspect that has so far received limited attention is that benefits will largely depend on the eventual deployment pattern of electricity infrastructure which is currently characterized by severe locational, sizing and timing uncertainty. Given the lack of coordination between generation and network developments across Europe, there is a real risk for over-investment or a premature lock-in to options that exhibit limited adaptability. In the near future, important choices that have to be made concerning the network topology and amount of investment. In this paper we identify the optimal, in terms of reduced cost, network investment (including topology) in the North Seas countries under four deployment scenarios and five distinct policy choices differing in the level of offshore coordination and international market integration. By drawing comparisons between the study results, we quantify the net benefit of enabling different types of coordination under each scenario. Furthermore, we showcase a novel min-max regret optimization model and identify minimum regret first-stage commitments which could be deployed in the near future in order to enhance strategic optionality, increase adaptability to different future conditions and hence reduce any potential sub-optimality of the initial network design. In view of the above, we put forward specific policy recommendations regarding the adoption of a flexible anticipatory expansion framework for the identification of attractive investment opportunities under uncertainty. (C) 2017 Elsevier B.V. All rights reserved.
dc.languageen
dc.publisherElsevier
dc.rightshttp://creativecommons.org/licenses/by-nc-nd/3.0/cl/
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 Chile
dc.sourceEnergy Economics
dc.subjectOnshore and offshore transmission investment
dc.subjectCross border interconnection
dc.subjectOffshore coordination
dc.subjectMin max regret planning
dc.subjectNet benefit allocation
dc.titleCoordination and uncertainty in strategic network investment: case on the north seas grid
dc.typeArtículos de revistas


Este ítem pertenece a la siguiente institución