The utilization of standardized work in manufacturing has achieved many benefits, thus motivating researchers to apply them in the construction environment. The aim of this research is to identify gaps that involve standardized work applications inserted in the construction environment. We adopted a literature review approach focusing on studies in construction sector that addressed standardized work applications. Subsequently, comparative tables of these publications were prepared and analyzed. Finally, opportunities to apply the standardized work elements, documents and tools in future works were identified. The article points out that there is a shortage in publications that address the application of these elements and tools in construction. From the construction flow analysis, we observed that almost all papers were applying job site flow. Standardized work elements analysis pointed out that the three elements (takt time, sequence and work in process) should be applied in the same process. The analysis of standardized work tools and documents showed that some documents have not been utilized in construction, they are: production capacity sheet, Standardized Work Chart and verification process sheet. We also realized a lack of a method to implement the standardized work in construction. This paper contributes to standardized work expansion in construction environment by utilizing its elements, documents and tools.
Benetti, H.P., Filho, J.I.P., Siliprandi, E.M., Saurim, T.A., Padronização do trabalho em uma fábrica de artefatos de cimento (2007) ENEGEP 2007, , Foz do Iguaçu. Anais. ABEPRO, 2007 Bulhões, I.A., Picchi, F.A., Folch, A.T., Actions to implement continuous flow in the assembly of prefabricated concrete structure (2006) IGLC, 14. , Santiago, Chile Bulhões, I.A., Picchi, F.A., Granja, A.D., Combining value stream and process levels analysis for continuous flow implementation in construction (2005) IGLC, 13. , Sidney, Australia Carneiro, A., Miranda Filho, A., Alves, T., Nascimento, K., Carneiro, R., Barros Neto, J., Development and evolution of project production systems: The PS- 37 case (2009) IGLC, 17. , Taipei, Taiwan Carneiro, A.Q., (2007) Estudo Sobre a Aplicação do Conceito de Célula de Produção Na Construção Civil, , Monografia. Curso de Engenharia Civil, Univ. Federal do Ceará, Fortaleza Feng, P., Ballard, G., Standard work from a lean theory perspective (2008) IGLC, 16. , Manchester, UK Ferraz, J.L.M., Nascimento, K.R., Romano, W.C.B.T., Souza, D.P., Barros Neto, J.P., Heineck, L.F.M., Um modelo para o planejamento e controle de obras - A transição de um processo de racionalização tecnológica e administrativa para um ambiente de produção enxuta (2005) SIBRAGEC, , Porto Alegre. Anais. Brazil Formoso, C.T., (2002) Lean Construction: Princípios Básicos E Exemplos, Construção Mercado: Custos, Suprimentos, Planejamento E Controle de Obra, 15 (1), pp. 50-58. , (in Portuguese) Federal University of Rio Grande do Sul- NORIE/UFRS Francelino, T.R., Barros Neto, J.P., Heineck, L.F.M., Teixeira, M.C., Kemmer, L.C., Melhorias de processos com a aplicação da filosofia lean (2006) ENEGEP 2006, , Fortaleza. Anais. ABEPRO, 2006 Gallardo, C.A., Granja, A.D., Picchi, F.A., Folch, A.T., Stabilization and standardization of a precast production process (2006) IGLC, 14. , Santiago, Chile Horman, M.J., Thomas, H.R., Role of inventory buffers in construction labor Performance (2005) ASCE, J. of Constr. Engrg. and Mgmt, 131 (7), pp. 834-843 Huntzinger, J., (2005) The Roots of Lean, , www.lean.org Kishida, M., Silva, A., Guerra, E., (2006) Benefícios da Implementação do Trabalho Padronizado Na Thyssenkrupp, , www.lean.org.br Koskela, L., (2000) An Exploration towards a Production Theory and its Application to Construction, p. 296. , Thesis (Doctor of Technology) - Technical Research Centre of Finland - VTT. Helsinki Kurek, J., (2005) Introdução Dos Princípios da Construção Enxuta No Processo de Produção Em Uma Construtora de Passo Fundo-RS(in Portuguese), , Master Thesis (MSc).School of Civil Engineering, University of Passo Fundo (2003) Lean Lexicon: A Graphical Glossary for Lean Thinkers, p. 102. , Lean Enterprise Institute, 2 ed. Lean Enterprise Institute. U.S.A Liker, J.K., The toyota way (2004) 14 Management Principles from the World's Greatest Manufacturer, p. 330. , 1 ed. McGraw-Hill. United States of America Liker, J., Meier, D., (2006) The Toyota Way Fieldbook: A Practical Guide for Implementing Toyota's 4Ps, p. 288. , New York, McGraw-Hill Lima, M.M.X., Bisio, L.R.A., Alves, T.C.A., Value stream mapping of the architectural executive design in a governmental organization (2010) IGLC, 18. , Haifa, Israel Marksberry, P., Rammohan, R., Vu, D., A systems study on standardized work: A toyota perspective (2011) Inter. J. of Prod. and Quality Mgmt, 7 (3), pp. 287-303 Miranda, M.C.M., Alencar, L.H., Campos, C.A.O., Pontes, L.A.C., Ghinato, P., Um modelo para o sistema de construção enxuta a partir do sistema toyota de produção (in Portuguese) (2003) ENEGEP, , Ouro Preto.Brazil Monden, Y., (1998) Toyota Production System: An Integrated Approach to Just in Time, p. 423. , 3 ed. Norcross GA: Engineering and Pressure Nakagawa, Y., Importance of standard operating procedure documents and visualization to implement Lean Construction (2005) IGLC, 13. , Sidney, Australia Nakagawa, Y., Shimizu, Y., Toyota production system adopted by building construction in Japan (2004) IGLC, 12. , 2004, Copenhagen, Denmark Ohno, T., (1988) Toyota Production System: beyond Large Scale Production, , Productivity Press, Cambridge, MA Patussi, F.A., Heineck, L.F.M., Aplicação do conceito de célula de produção na execução de serviços em obra de pequeno porte(in Portuguese) (2009) SIBRAGEC, , Joao Pessoa, Brazil Picchi, F.A., Oportunidades da aplicação do lean thinking na construção(in Portuguese) (2003) Revista Ambiente Construído, 3 (1), pp. 7-23 Picchi, F.A., System view of lean construction application opportunities (2001) IGLC, 9. , Singapore Polesi, P., Frödell, M., Josephson, P., Implementing standardization in medium-sized construction firms: Facilitating site managers feeling of freedom through a bottom-up approach (2009) IGLC, 17. , Taipei, Taiwan Rother, M., Harris, R., (2002) Creating Continuous Flow, p. 104. , 1 ed. Lean Enterprise Institute.U.S.A Salermo, L.S., (2005) Aplicação de Ferramentas da Mentalidade Enxuta E da Manutenção Autônoma Aos Serviços de Manutenção Dos Sistemas Prediais de áGua (In Portuguese), , Master Thesis (MSc).School of Civil Engineering, Architecture and Urban Design, Department of Architecture and Buildings, University of Campinas Santos, A., Formoso, C.T., Tookey, J.E., Expanding the meaning of standardization within construction processes (2002) The TQM Magazine, 14 (1), pp. 25-33 Shook, J.Y., Bringing the toyota production system to the united states: A personnal perspective (1997) Becoming Lean: inside Stories of U.S. Manufactures, , LYKER, J.K. (Ed.), Portland, OR: Productivity Press Souza, D.P., Bastos, M.R., Barros Neto, J.P., Moura, R.S.M., Pereira, P.E., Heineck, L.F.M., (2005) Uma Metodologia de Implantação do Sistema Toyota de Produção Em Uma Empresa de Construção de Edifícios a Partir do Suporte Tecnológico do Programa de Inovação da Construção Civil do Ceará (INOVACON-CE)., , (in Portuguese) SIBRAGEC, Porto Alegre, Brazil Suzaki, K., (1987) The New Manufacturing Challenge: Techniques for Continuous Improvement, , New York: Free Press Tezel, A., Koskela, L., Fazenda, T.P., Formoso, C.T., Thais, A., Neto, B., Viana, D., Mota, B., Process transparency on construction sites: Examples from construction companies in Brazil (2010) IGLC, 18. , Haifa, Israel Womack, J.P., Jones, D.T., (1996) Lean Thinking: Banish Waste and Create Wealth in your Corporation, , Simon & Shuster Yu, H., Tweed, T., Al-Hussein, M., NasserI, R., Managing variability in house production (2007) IGLC, 15. , Michigan, USA Yu, H., Tweed, T., Al-Hussein, M., Nasseri, R., Development of lean model for house construction using value stream mapping (2009) ASCE, J. of Constr. Engrg. and Mgmt., 135 (8), pp. 782-790