dc.creatorMariz R.N.
dc.creatorPicchi F.A.
dc.creatorGranja A.D.
dc.creatorDe Melo R.S.S.
dc.date2012
dc.date2015-06-25T20:27:19Z
dc.date2015-11-26T15:24:01Z
dc.date2015-06-25T20:27:19Z
dc.date2015-11-26T15:24:01Z
dc.date.accessioned2018-03-28T22:32:53Z
dc.date.available2018-03-28T22:32:53Z
dc.identifier
dc.identifierIglc 2012 - 20th Conference Of The International Group For Lean Construction. , v. , n. , p. - , 2012.
dc.identifier
dc.identifier
dc.identifierhttp://www.scopus.com/inward/record.url?eid=2-s2.0-84874468828&partnerID=40&md5=88dbc04e36b84b3863d952490d033962
dc.identifierhttp://www.repositorio.unicamp.br/handle/REPOSIP/90716
dc.identifierhttp://repositorio.unicamp.br/jspui/handle/REPOSIP/90716
dc.identifier2-s2.0-84874468828
dc.identifier.urihttp://repositorioslatinoamericanos.uchile.cl/handle/2250/1260580
dc.descriptionThe utilization of standardized work in manufacturing has achieved many benefits, thus motivating researchers to apply them in the construction environment. The aim of this research is to identify gaps that involve standardized work applications inserted in the construction environment. We adopted a literature review approach focusing on studies in construction sector that addressed standardized work applications. Subsequently, comparative tables of these publications were prepared and analyzed. Finally, opportunities to apply the standardized work elements, documents and tools in future works were identified. The article points out that there is a shortage in publications that address the application of these elements and tools in construction. From the construction flow analysis, we observed that almost all papers were applying job site flow. Standardized work elements analysis pointed out that the three elements (takt time, sequence and work in process) should be applied in the same process. The analysis of standardized work tools and documents showed that some documents have not been utilized in construction, they are: production capacity sheet, Standardized Work Chart and verification process sheet. We also realized a lack of a method to implement the standardized work in construction. This paper contributes to standardized work expansion in construction environment by utilizing its elements, documents and tools.
dc.description
dc.description
dc.description
dc.description
dc.descriptionBenetti, H.P., Filho, J.I.P., Siliprandi, E.M., Saurim, T.A., Padronização do trabalho em uma fábrica de artefatos de cimento (2007) ENEGEP 2007, , Foz do Iguaçu. Anais. ABEPRO, 2007
dc.descriptionBulhões, I.A., Picchi, F.A., Folch, A.T., Actions to implement continuous flow in the assembly of prefabricated concrete structure (2006) IGLC, 14. , Santiago, Chile
dc.descriptionBulhões, I.A., Picchi, F.A., Granja, A.D., Combining value stream and process levels analysis for continuous flow implementation in construction (2005) IGLC, 13. , Sidney, Australia
dc.descriptionCarneiro, A., Miranda Filho, A., Alves, T., Nascimento, K., Carneiro, R., Barros Neto, J., Development and evolution of project production systems: The PS- 37 case (2009) IGLC, 17. , Taipei, Taiwan
dc.descriptionCarneiro, A.Q., (2007) Estudo Sobre a Aplicação do Conceito de Célula de Produção Na Construção Civil, , Monografia. Curso de Engenharia Civil, Univ. Federal do Ceará, Fortaleza
dc.descriptionFeng, P., Ballard, G., Standard work from a lean theory perspective (2008) IGLC, 16. , Manchester, UK
dc.descriptionFerraz, J.L.M., Nascimento, K.R., Romano, W.C.B.T., Souza, D.P., Barros Neto, J.P., Heineck, L.F.M., Um modelo para o planejamento e controle de obras - A transição de um processo de racionalização tecnológica e administrativa para um ambiente de produção enxuta (2005) SIBRAGEC, , Porto Alegre. Anais. Brazil
dc.descriptionFormoso, C.T., (2002) Lean Construction: Princípios Básicos E Exemplos, Construção Mercado: Custos, Suprimentos, Planejamento E Controle de Obra, 15 (1), pp. 50-58. , (in Portuguese) Federal University of Rio Grande do Sul- NORIE/UFRS
dc.descriptionFrancelino, T.R., Barros Neto, J.P., Heineck, L.F.M., Teixeira, M.C., Kemmer, L.C., Melhorias de processos com a aplicação da filosofia lean (2006) ENEGEP 2006, , Fortaleza. Anais. ABEPRO, 2006
dc.descriptionGallardo, C.A., Granja, A.D., Picchi, F.A., Folch, A.T., Stabilization and standardization of a precast production process (2006) IGLC, 14. , Santiago, Chile
dc.descriptionHorman, M.J., Thomas, H.R., Role of inventory buffers in construction labor Performance (2005) ASCE, J. of Constr. Engrg. and Mgmt, 131 (7), pp. 834-843
dc.descriptionHuntzinger, J., (2005) The Roots of Lean, , www.lean.org
dc.descriptionKishida, M., Silva, A., Guerra, E., (2006) Benefícios da Implementação do Trabalho Padronizado Na Thyssenkrupp, , www.lean.org.br
dc.descriptionKoskela, L., (2000) An Exploration towards a Production Theory and its Application to Construction, p. 296. , Thesis (Doctor of Technology) - Technical Research Centre of Finland - VTT. Helsinki
dc.descriptionKurek, J., (2005) Introdução Dos Princípios da Construção Enxuta No Processo de Produção Em Uma Construtora de Passo Fundo-RS(in Portuguese), , Master Thesis (MSc).School of Civil Engineering, University of Passo Fundo
dc.description(2003) Lean Lexicon: A Graphical Glossary for Lean Thinkers, p. 102. , Lean Enterprise Institute, 2 ed. Lean Enterprise Institute. U.S.A
dc.descriptionLiker, J.K., The toyota way (2004) 14 Management Principles from the World's Greatest Manufacturer, p. 330. , 1 ed. McGraw-Hill. United States of America
dc.descriptionLiker, J., Meier, D., (2006) The Toyota Way Fieldbook: A Practical Guide for Implementing Toyota's 4Ps, p. 288. , New York, McGraw-Hill
dc.descriptionLima, M.M.X., Bisio, L.R.A., Alves, T.C.A., Value stream mapping of the architectural executive design in a governmental organization (2010) IGLC, 18. , Haifa, Israel
dc.descriptionMarksberry, P., Rammohan, R., Vu, D., A systems study on standardized work: A toyota perspective (2011) Inter. J. of Prod. and Quality Mgmt, 7 (3), pp. 287-303
dc.descriptionMiranda, M.C.M., Alencar, L.H., Campos, C.A.O., Pontes, L.A.C., Ghinato, P., Um modelo para o sistema de construção enxuta a partir do sistema toyota de produção (in Portuguese) (2003) ENEGEP, , Ouro Preto.Brazil
dc.descriptionMonden, Y., (1998) Toyota Production System: An Integrated Approach to Just in Time, p. 423. , 3 ed. Norcross GA: Engineering and Pressure
dc.descriptionNakagawa, Y., Importance of standard operating procedure documents and visualization to implement Lean Construction (2005) IGLC, 13. , Sidney, Australia
dc.descriptionNakagawa, Y., Shimizu, Y., Toyota production system adopted by building construction in Japan (2004) IGLC, 12. , 2004, Copenhagen, Denmark
dc.descriptionOhno, T., (1988) Toyota Production System: beyond Large Scale Production, , Productivity Press, Cambridge, MA
dc.descriptionPatussi, F.A., Heineck, L.F.M., Aplicação do conceito de célula de produção na execução de serviços em obra de pequeno porte(in Portuguese) (2009) SIBRAGEC, , Joao Pessoa, Brazil
dc.descriptionPicchi, F.A., Oportunidades da aplicação do lean thinking na construção(in Portuguese) (2003) Revista Ambiente Construído, 3 (1), pp. 7-23
dc.descriptionPicchi, F.A., System view of lean construction application opportunities (2001) IGLC, 9. , Singapore
dc.descriptionPolesi, P., Frödell, M., Josephson, P., Implementing standardization in medium-sized construction firms: Facilitating site managers feeling of freedom through a bottom-up approach (2009) IGLC, 17. , Taipei, Taiwan
dc.descriptionRother, M., Harris, R., (2002) Creating Continuous Flow, p. 104. , 1 ed. Lean Enterprise Institute.U.S.A
dc.descriptionSalermo, L.S., (2005) Aplicação de Ferramentas da Mentalidade Enxuta E da Manutenção Autônoma Aos Serviços de Manutenção Dos Sistemas Prediais de áGua (In Portuguese), , Master Thesis (MSc).School of Civil Engineering, Architecture and Urban Design, Department of Architecture and Buildings, University of Campinas
dc.descriptionSantos, A., Formoso, C.T., Tookey, J.E., Expanding the meaning of standardization within construction processes (2002) The TQM Magazine, 14 (1), pp. 25-33
dc.descriptionShook, J.Y., Bringing the toyota production system to the united states: A personnal perspective (1997) Becoming Lean: inside Stories of U.S. Manufactures, , LYKER, J.K. (Ed.), Portland, OR: Productivity Press
dc.descriptionSouza, D.P., Bastos, M.R., Barros Neto, J.P., Moura, R.S.M., Pereira, P.E., Heineck, L.F.M., (2005) Uma Metodologia de Implantação do Sistema Toyota de Produção Em Uma Empresa de Construção de Edifícios a Partir do Suporte Tecnológico do Programa de Inovação da Construção Civil do Ceará (INOVACON-CE)., , (in Portuguese) SIBRAGEC, Porto Alegre, Brazil
dc.descriptionSuzaki, K., (1987) The New Manufacturing Challenge: Techniques for Continuous Improvement, , New York: Free Press
dc.descriptionTezel, A., Koskela, L., Fazenda, T.P., Formoso, C.T., Thais, A., Neto, B., Viana, D., Mota, B., Process transparency on construction sites: Examples from construction companies in Brazil (2010) IGLC, 18. , Haifa, Israel
dc.descriptionWomack, J.P., Jones, D.T., (1996) Lean Thinking: Banish Waste and Create Wealth in your Corporation, , Simon & Shuster
dc.descriptionYu, H., Tweed, T., Al-Hussein, M., NasserI, R., Managing variability in house production (2007) IGLC, 15. , Michigan, USA
dc.descriptionYu, H., Tweed, T., Al-Hussein, M., Nasseri, R., Development of lean model for house construction using value stream mapping (2009) ASCE, J. of Constr. Engrg. and Mgmt., 135 (8), pp. 782-790
dc.languageen
dc.publisher
dc.relationIGLC 2012 - 20th Conference of the International Group for Lean Construction
dc.rightsfechado
dc.sourceScopus
dc.titleA Review Of The Standardized Work Application In Construction