Buscar
Mostrando ítems 1-10 de 1918
Effects of uncertainty on scheduling of highway construction projects
(Universidad Nacional de Colombia (Sede Medellín). Facultad de Minas., 2015-09-01)
Time and cost overruns in highway construction are usual in Colombia. Contractors regularly fail in cost estimation and construction scheduling. An analysis of important factors on time and cost overruns in highway ...
MULTIPLE ANT COLONY SYSTEM FOR A VRP WITH TIME WINDOWS AND SCHEDULED LOADING
(Universidad de Tarapacá., 2009)
Scheduling the South American Qualifiers to the 2018 FIFA World Cup by integer programming
(Elsevier Science, 2017-11)
Every four years, the 10 national teams members of the South American Football Confederation (CONMEBOL) compete for one of the South American slots in the final phase of the FIFA World Cup. The qualifying competition ...
A heuristic algorithm based on multi-assignment procedures for nurse scheduling
(2013-04-03)
This paper tackles a Nurse Scheduling Problem which consists of generating work schedules for a set of nurses while considering their shift preferences and other requirements. The objective is to maximize the satisfaction ...
A heuristic algorithm based on multi-assignment procedures for nurse scheduling
(2013-04-03)
This paper tackles a Nurse Scheduling Problem which consists of generating work schedules for a set of nurses while considering their shift preferences and other requirements. The objective is to maximize the satisfaction ...
A memetic algorithm for the total tardiness single machine scheduling problem
(Elsevier Science BvAmsterdamHolanda, 2001)
The reversibility property in a job-insertion tiebreaker for the permutational flow shop scheduling problem
(Elsevier B.V.PE, 2021)
The best performing approximate methods proposed for the permutational flow shop scheduling problem with makespan minimization are the well known NEH constructive heuristic and the iterated greedy algorithm. Both methods ...
Scheduling the South American qualifiers to the 2018 FIFA World Cup by integer programming
(Elsevier, 2017)
Every four years, the 10 national teams members of the South American Football Confederation (CON- MEBOL) compete for one of the South American slots in the final phase of the FIFA World Cup. The qual- ifying competition ...
Simulation-Based Optimization for the Scheduling of Elective Surgery Under Uncertainty And Downstream Capacity Constraints
(Universidad Nacional del Sur, 2020-02)
The generation of an optimal schedule of elective surgery cases for a hospital surgery services unit is a well-known problem in the operations research field. The complexity of the problem is greatly compounded when ...
Heuristic methods for the single machine scheduling problem with different ready times and a common due date
(TAYLOR & FRANCIS LTDABINGDON, 2012)
The single machine scheduling problem with a common due date and non-identical ready times for the jobs is examined in this work. Performance is measured by the minimization of the weighted sum of earliness and tardiness ...