Buscar
Mostrando ítems 1-10 de 5255
A Max-Min Ant System algorithm to solve the Software Project Scheduling Problem
(Elsevier Ltd, 2014)
Firefly algorithm to solve a project scheduling problem
(Springer Verlag, 2016)
Ants can schedule software projects
(Springer Verlag, 2013)
A scheduling problem for software project solved with ABC metaheuristic
(Springer Verlag, 2015)
A software project management problem solved by firefly algorithm
(Springer Verlag, 2016)
An alternative solution to the software project scheduling problem
(Springer Verlag, 2016)
Scheduler simulation using iSPD, an iconic-based computer grid simulator
(2012-09-28)
Increased accessibility to high-performance computing resources has created a demand for user support through performance evaluation tools like the iSPD (iconic Simulator for Parallel and Distributed systems), a simulator ...
Scheduler simulation using iSPD, an iconic-based computer grid simulator
(2012-09-28)
Increased accessibility to high-performance computing resources has created a demand for user support through performance evaluation tools like the iSPD (iconic Simulator for Parallel and Distributed systems), a simulator ...
Scheduling the scheduling task: a time-management perspective on scheduling
(Springer, 2017-10-28)
The objective of this study was to characterize how schedulers spend their time interacting with external parties. Time is the most critical resource at the disposal of schedulers; however, its usage has been overlooked ...