Conference Paper
Ants can schedule software projects
Fecha
2013Registro en:
373, PART I, 635-639
18650929
Autor
Crawford B.
Soto R.
Johnson F.
Monfroy E.
Institución
Materias
Ítems relacionados
Mostrando ítems relacionados por Título, autor o materia.
-
A Max-Min Ant System algorithm to solve the Software Project Scheduling Problem
Crawford B.; Soto R.; Johnson F.; Monfroy E.; Paredes F. (Elsevier Ltd, 2014) -
An alternative solution to the software project scheduling problem
Crawford B.; Soto R.; Astorga G.; Olguín E. (Springer Verlag, 2016) -
A scheduling problem for software project solved with ABC metaheuristic
Crawford B.; Soto R.; Johnson F.; Vargas M.; Misra S.; Paredes F. (Springer Verlag, 2015)