Buscar
Mostrando ítems 61-70 de 29775
Simulation of the model predictive control applied to a combined cycle plant
(Institute of Electrical and Electronics Engineers Inc., 2016-10)
We present the simulation of the application of the Model-based Predictive Control (MPC) of the drum level in a Combined Cycle Plant in order to minimize the time for reaching the highest capacity of plant, around 225 MW. ...
Improvement of radiology services based on the process management approach
(ELSEVIER IRELAND LTD, 2011)
The health sector requires continuous investments to ensure the improvement of products and services from a technological standpoint, the use of new materials, equipment and tools, and the application of process management ...
Reference Model and Methodology to Improve the Product Development Process-Edición Única
(Instituto Tecnológico y de Estudios Superiores de Monterrey, 2007-05-01)
Product development managers are looking for new ways to improve their product development process. Emerging concepts and solutions as Product Lifecycle Management (PLM), which is based on ...
A Process Reference Model for Managing Living Labs for ICT Innovation: A proposal based on ISO/IEC 15504
(Elsevier BV, 2013-07-16)
Living Labs are innovation infrastructures where software companies and research organizations collaborate with lead users to design and develop new products and services. There is not any reference model related to the ...
Separation of Concerns in Mobile Hypermedia: Architectural and Modeling Issues
(Engineering Science Reference, 2012)
Consumer response to models as reference group symbols in Brazilian advertising (reference group symbols in advertising)
(2005-11-24)
While previous studies have shown that advertisements in the U.S. are generally most effective when they match the race of the model and consumer. This study found that Brazilian consumers did not respond preferentially ...
Proposta de um modelo de referência para a configuração de um sistema de picking
(Universidade Federal de São CarlosBRUFSCarPrograma de Pós-Graduação em Engenharia de Produção - PPGEP, 2012-12-19)
The picking activity, one of the warehousing activities, produces representative costs in the warehousing. These costs could reach up to 75% of the total warehousing costs (COYLE2 et al., 1996 apud PETERSEN; AASE, 2004). ...
EM-based design optimization of microstrip lines traversing a rectangular gap in the reference plane
(Int. Conf. on Synthesis, Modeling, Analysis and Simulation Methods and Applications to Circuit Design (SMACD), 2012-09)
Reference Model and Methodology to Improve the Product Development Process-Edición Única
(Instituto Tecnológico y de Estudios Superiores de Monterrey, 2015)