dc.description | La investigación tiene por nombre.” ANÁLISIS COMPARATIVO DE LA APLICACIÓN DE
LA METODOLOGÍA BIM EN LA ETAPA DE PRE-CONSTRUCCIÓN Y SUS EFECTOS
EN LA CONSTRUCCIÓN DE PROYECTOS HOTELEROS DE LA EMPRESA ORION
GROUP, 2018 – 2019.” En la presente investigación se compararon los efectos de los diferentes
grados de maduración de la metodología BIM sobre la construcción en el Perú, tratando en todo
momento que se genere un fiel retrato de la realidad de este rubro en la actualidad. La
metodología “tradicional” de llevar la dirección y gestión de proyectos esta mostrando sus
falencias, por lo cual el siguiente paso en la búsqueda de la optimización de esta industria es el
empleo de nuevas metodologías, pero teniendo tantas y queriendo aplicarlas todas a la vez se
generan más problemas que beneficios, siendo así prudente centrarse en uno a la vez hasta
lograr su máximo desarrollo, siendo el elegido en la investigación la metodología BIM. Frente
a esta la investigación tubo como hipotesis inicial que mientras mas ceñido sigamos lo que
dictan las guías de aplicación, y mayor sea el grado de maduración (clasificación elegida de la
metodología para la presente investigación) escogido, mejores serán los efectos y resultados
obtenidos en los proyectos.
Para ratificar o refutar lo anteriormente dicho se recopilo información de 4 proyectos hoteleros
manejados por la empresa ORION GROUP y construidos durante le periodo 2018 - 2019, a los
cuales se les aplico diferentes grados de maduración de la metodología BIM, se tomó mayor
interés en información referida al presupuesto, cronograma y acuerdos formulados en la etapa
de Pre-construcción y las variaciones del presupuesto y cronograma vistos en la etapa de
construcción del proyecto y los RDI`s formulados por deficiencias en etapas anteriores, con
esta información se generaron fichas de documentación y resumen para manejar de mejor
manera la basta cantidad de datos manejados y se realizaron comparaciones entre los proyectos
y comparaciones con lo esperado según el marco teórico de la metodología, obteniendo al
finalizar una idea del estado actual de la aplicación de la metodología BIM en el Perú.
Tras realizar los análisis y las comparaciones se llego a ver que el aplicar los diferentes grados
de maduración de la metodología BIM tal como lo indican las guías de aplicación es
contraproducente, ya que fueron formuladas teniendo en cuenta otra realidad y otro perfil de
profesionales por lo cual la presencia de adaptaciones y modificaciones a la metodología son
necesarias para lograr obtener beneficios dentro de la construcción en el Perú, las cuales se han
ido dando como queda registrado en la investigación, el resultado final es un soporte técnico que apoyara al lector a poder identificar el grado de maduración idóneo a aplicar en su proyecto
con los recursos y el grupo de profesionales que posee y saber cuáles serán los aspectos
afectados por estos, produciendo mejores tomas de decisiones, así también las fichas de
documentación y el sistema de desarrollo empleado fueron formulados para la presente
investigación sin tener un referente nacional o latinoamericano de los mismos, pudiendo servir
de tal forma como un apoyo para realizar esta misma investigación en otros proyecto, pudiendo
generar de esta manera una mayor base de datos que sirviera como referente para la aplicación
de la metodología BIM en el país. | |
dc.description | The investigation has for name: ” COMPARATIVE ANALYSIS OF THE APPLICATION OF
THE BIM METHODOLOGY IN THE PRE-CONSTRUCTION STAGE AND ITS EFFECTS
IN THE CONSTRUCTION OF HOTEL PROJECTS OF THE COMPANY ORION GROUP,
2018 - 2019. ” In the present investigation, the effects of the different degrees of maturation of
the BIM methodology on construction in Peru were compared, trying at all times to generate a
faithful portrait of the reality of this item today. The “traditional“ methodology of leading the
direction and management of projects is showing its flaws, so the next step in the search for
optimization of this industry is the use of new methodologies, but having so many and wanting
to apply them all at once are generated more problems than benefits, thus it is prudent to focus
on one at a time until reaching its maximum development, the BIM methodology being chosen
in the research. In the face of this research, it was the initial hypothesis that the more tight we
follow what the application guidelines dictate, and the greater the degree of maturation (chosen
classification of the methodology for the present investigation) chosen, the better the effects
and results obtained in the projects.
To ratify or refute the aforementioned, information was collected from 4 hotel projects managed
by the ORION GROUP company and built during the 2018 - 2019 period, to which different
degrees of maturation of the BIM methodology were applied, greater interest in information
was taken referred to the budget, schedule and agreements formulated in the Pre-construction
stage and the variations of the budget and schedule seen in the construction stage of the project
and the RDI`s formulated by deficiencies in previous stages, with this information
documentation sheets were generated and summary to better manage the large amount of data
handled and comparisons were made between the projects and comparisons with the expected
according to the theoretical framework of the methodology, obtaining at the end an idea of the
current state of the application of the BIM methodology in the Peru.
After carrying out the analyzes and comparisons, it was possible to see that applying the
different degrees of maturation of the BIM methodology as indicated in the application
guidelines is counterproductive, since they were formulated taking into account another reality
and another profile of professionals. which the presence of adaptations and modifications to the
methodology are necessary to obtain benefits within the construction in Peru, which have been
given as recorded in the investigation, the final result is a technical support that will support the
reader to be able to Identify the appropriate degree of maturation to apply in your project with the resources and the group of professionals you have and know what the aspects affected by
these will be, producing better decision-making, as well as the documentation sheets and the
development system used were formulated for the present investigation without having a
national or Latin American reference of these, being able to serve in this way as a support to
carry out this same research in other projects, being able to generate in this way a larger database
that would serve as a reference for the application of the BIM methodology in the country. | |
dc.description | Tesis | |
dc.format | application/pdf | |
dc.language | spa | |
dc.publisher | Universidad Andina del Cusco | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights | https://creativecommons.org/licenses/by-nc-nd/2.5/pe/ | |
dc.source | Repositorio Institucional UAC | |
dc.source | Universidad Andina del Cusco | |
dc.subject | Empresas constructoras | |
dc.subject | Proyectos | |
dc.subject | Recursos humanos | |
dc.subject | Construcción--Perú | |
dc.title | Análisis comparativo de la aplicación de la metodología BIM en la etapa de pre-construcción y sus efectos en la construcción de proyectos hoteleros de la empresa Orion Group, 2018 – 2019 | |
dc.type | info:eu-repo/semantics/bachelorThesis | |