dc.contributorDel Savio, Alexandre Almeida
dc.creatorBorja Bendezu, Mariana Camila
dc.creatorBarcena Serna, Maria Luisa
dc.date.accessioned2024-01-29T16:40:07Z
dc.date.accessioned2024-05-08T13:30:46Z
dc.date.available2024-01-29T16:40:07Z
dc.date.available2024-05-08T13:30:46Z
dc.date.created2024-01-29T16:40:07Z
dc.date.issued2023
dc.identifierBorja Bendezu, M. C. & Barcena Serna, M. L. (2023). Construction process time optimization of a reinforced concrete reaction slab, implementing the VDC methodology [Tesis para optar el Título Profesional de Ingeniero Civil, Universidad de Lima]. Repositorio Institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/19824
dc.identifierhttps://hdl.handle.net/20.500.12724/19824
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/9356120
dc.description.abstractThe Architecture, Engineering, and Construction (AEC) industry has shown low productivity levels, mainly due to the fragmentation between the agents involved. Given this, the industry is modernizing and implement-ing collaborative methodologies to improve the development of projects. One of them is the VDC (Virtual Design and Construction) methodology. VDC allows us to improve design, construction, operation, and maintenance management, changing paradigms within traditional processes. This research shows how imple-menting VDC can help to optimize the construction process time of a reinforced concrete reaction slab in a civil engineering laboratory. As a main result, an optimized process was developed, generating a 44-day reduc-tion in the construction time of the reaction slab.
dc.languageeng
dc.publisherUniversidad de Lima
dc.publisherPE
dc.rightsinfo:eu-repo/semantics/restrictedAccess
dc.sourceRepositorio Institucional - Ulima
dc.sourceUniversidad de Lima
dc.titleConstruction process time optimization of a reinforced concrete reaction slab, implementing the VDC methodology
dc.typeinfo:eu-repo/semantics/bachelorThesis