dc.contributor | Mendiola Flórez, David Enrique Serafín | |
dc.creator | Torpoco Caparó, Oscar Enrique | |
dc.date | 2024-02-21T16:04:12Z | |
dc.date | 2024-02-21T16:04:12Z | |
dc.date | 2023 | |
dc.date | 2024-02-21 | |
dc.date.accessioned | 2024-05-07T15:55:31Z | |
dc.date.available | 2024-05-07T15:55:31Z | |
dc.identifier | http://hdl.handle.net/20.500.12404/27148 | |
dc.identifier.uri | https://repositorioslatinoamericanos.uchile.cl/handle/2250/9334143 | |
dc.description | El robo de cables y componentes eléctricos en el Perú ha ocasionado pérdidas
económicas y problemas en el suministro de energía eléctrica. En el presente
informe se plantea un análisis sobre la aplicación de la fuerza mayor como
eximente de responsabilidad en un contrato de concesión de servicio público de
distribución de energía eléctrica.
El caso involucra a EDECAÑETE S.A., quien solicitó la aplicación de la fuerza
mayor debido al robo de conductores eléctricos; no obstante, OSINERGMIN
denegó la solicitud argumentando que el robo era frecuente en la zona, y, por
tanto, no se cumplirían con los requisitos de fuerza mayor establecido en la
normativa. En ese sentido, cabe analizar la correcta aplicación de los requisitos
de fuerza mayor en el sector eléctrico.
Para resolver el problema planteado será necesario analizar la obligación del
suministro eléctrico, el desarrollo del concepto de la fuerza mayor como
excepción ante la variación del suministro y la aplicación de la fuerza mayor
dentro del procedimiento administrativo correspondiente. | |
dc.description | The theft of cables and electrical components in Peru has caused economic
losses and problems in the supply of electrical energy. This report presents an
analysis of the application of force majeure as an exemption from liability in a
public service concession contract for the distribution of electrical energy.
The case involves EDECAÑETE S.A., who requested the application of force
majeure due to the theft of electrical conductors; However, OSINERGMIN denied the request, arguing that theft was frequent in the area, and, therefore, the force
majeure requirements established in the regulations would not be met. In this
sense, it is worth analyzing the correct application of force majeure requirements
in the electricity sector.
To resolve the problem posed, it will be necessary to analyze the obligation of
electricity supply, the development of the concept of force majeure as an
exception to the variation in supply and the application of force majeure within
the corresponding administrative procedure. | |
dc.format | application/pdf | |
dc.format | application/pdf | |
dc.language | spa | |
dc.publisher | Pontificia Universidad Católica del Perú | |
dc.publisher | PE | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights | Atribución-CompartirIgual 2.5 Perú | |
dc.rights | http://creativecommons.org/licenses/by-sa/2.5/pe/ | |
dc.subject | Contratos de suministro | |
dc.subject | Servicios públicos--Regulación--Perú | |
dc.subject | Industrias energéticas--Regulación--Perú | |
dc.subject | https://purl.org/pe-repo/ocde/ford#5.05.01 | |
dc.title | Resolución de Gerencia General OSINERGMIN N° 3474- 2007-OS/GG, requisitos de la fuerza mayor como eximente de responsabilidad ante la interrupción del suministro eléctrico. | |
dc.type | info:eu-repo/semantics/bachelorThesis | |