dc.identifierChirinos Santander, L. R., & Pecho Llacta, J. C. (2019, April 1). Implementación de la metodología BIM en la construcción del proyecto multifamiliar DUPLO para optimizar el costo establecido. Universidad Peruana de Ciencias Aplicadas (UPC). Universidad Peruana de Ciencias Aplicadas (UPC), Lima, Perú. Retrieved from https://repositorioacademico.upc.edu.pe/handle/10757/626030
dc.identifierhttp://hdl.handle.net/10757/626030
dc.identifier0000 0001 2196 144X
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/9295389
dc.description.abstractEl mundo de la construcción viene cambiando, siempre buscando la mejora continua y la optimización de los procesos. Debido a ello surge la necesidad de usar nuevas metodologías aplicadas en otros países donde los procesos de la construcción se vienen industrializando. Dentro de estas metodologías tenemos: • Las Tecnologías de Información y Comunicación, donde resalta la manera correcta de gestionar un proyecto de construcción. • Lean Proyect Delivery System, introducido por Ballard (2000). • Virtual Desing and Construction (VDC). • Bim Execution Plan (BEP). Siendo el BEP el plan de implementación del BIM a un proyecto. Nosotros optamos por usar la metodología BIM en el proyecto Multifamiliar DUPLO ubicado en el distrito de Breña, tiene 28 pisos y cuenta con 05 sótanos. El plazo para la ejecución otorgado según contrato fue de 12 meses. La finalidad de aplicar la metodología BIM es poder controlar el costo del proyecto según el presupuesto adjudicado. Con la aplicación del BIM pretendemos evitar: • Los tiempos muertos por consultas a los proyectistas durante la construcción. • Las ampliaciones de plazo por indefiniciones o RFI´s no resueltos. • El sobrecosto que conlleva una ampliación de plazo (mayores gastos generales, sobre costo por alquiler de equipos, máquinas y herramientas, mano de obra). La aplicación de la metodología BIM al proyecto Duplo servirá para identificar todas las interferencias de las diversas especialidades antes de la ejecución en el terreno. Realizando las reuniones colaborativas y/o ICE SESIONS encabezadas por un Bim Manager se logran identificar y resolver las incompatibilidades, cada participante sabe el papel que desempeña. Al finalizar el proyecto, se evaluará los resultados con la aplicación de la metodología BIM, en nuestro caso el resultado fue favorable.
dc.description.abstractThe world of construction is changing, always looking for continuous improvement and optimization of processes. Due to this, there is a need to use new methodologies applied in other countries where construction processes are being industrialized. Within these methodologies we have: • Information and Communication Technologies, where the correct way to manage a construction project stands out. • Lean Project Delivery System, introduced by Ballard (2000). • Virtual Design and Construction (VDC). • BIM Execution Plan (BEP). The BEP being the BIM implementation plan for a project. We chose to use the BIM methodology in the DUPLO Multifamily project located in the district of Breña, it has 28 floors and has 05 basements. The term for execution granted under the contract was 12 months. The purpose of applying the BIM methodology is to be able to control the cost of the project according to the allocated budget. With the BIM application we intend to avoid: • Downtime due to consultations with the designers during construction. • Term extensions due to undefined or unresolved RFIs. • The cost of extending the term (higher overhead costs, cost of renting equipment, machines and tools, labor). The application of the BIM methodology to the Duplo project will serve to identify all the interferences of the various specialties before the execution in the field. Conducting collaborative meetings and / or ICE SESSIONS led by a BIM Manager can identify and resolve incompatibilities, each participant knows the role it plays. At the end of the project, the results will be evaluated with the application of the BIM methodology, in our case the result was favorable. Keyword: BIM Methodology reduces incompatibilities in a project; This optimizes and controls the cost established in the budget.
dc.publisherUniversidad Peruana de Ciencias Aplicadas (UPC)
dc.publisherPE
dc.rightshttp://creativecommons.org/licenses/by-nc-sa/3.0/us/
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rightsAttribution-NonCommercial-ShareAlike 3.0 United States
dc.sourceUniversidad Peruana de Ciencias Aplicadas (UPC)
dc.sourceRepositorio Académico - UPC
dc.subjectMetodología BIM
dc.subjectCostos
dc.subjectPresupuesto
dc.subjectBIM Methodology
dc.subjectProject
dc.subjectBudget
dc.titleImplementación de la metodología BIM en la construcción del proyecto multifamiliar DUPLO para optimizar el costo establecido
dc.typeinfo:eu-repo/semantics/masterThesis