dc.descriptionEl procedimiento para el dimensionamiento del cruce de líneas inicia con la simulación de la línea de transmisión existente L-5033 Poroma – Yarabamba de 500 kV, entre las estructuras E-585 y E-587, considerando las condiciones más críticas de operación se especifica las distancias hacia la línea de transmisión proyectada Solimana - Ocoña de 220 kV, es decir, entre los conductores y cables de guarda que cruzarán por debajo de los existentes. Es importante resaltar que la topografía en la zona de cruce presenta desniveles en dirección transversal y longitudinal. A continuación, se evalúa los efectos electromagnéticos en los puntos críticos en común de ambas líneas de transmisión sobre el terreno, tomando en cuenta diversas secuencias de fase en la línea proyectada para mostrar la influencia de su selección. Como resultado, el principal efecto electromagnético es el campo eléctrico, ya que influye directamente en la separación vertical entre conductores y al terreno, este efecto es sensible debido a la superposición de campos producido en conjunto con la línea de trasmisión existente de 500 kV. Adicionalmente, se evalúan las tensiones inducidas cuando la línea de 220 kV se encuentra desenergizada y se demuestra la influencia del ángulo de cruce. En resumen, el campo eléctrico producido en los puntos de intersección de servidumbres, en la zona de cruce, define la secuencia de fases de la línea proyectada. En consecuencia, el resto de la línea debe obedecer a dicha restricción.
dc.descriptionThe procedure for sizing the crossing of transmission lines begins with the simulation of the existing 500 kV transmission line L-5033 Poroma - Yarabamba, between structures E-585 and E-587, considering the most critical operating conditions. The distances to the projected 220 kV transmission line Solimana - Ocoña are specified, i.e., between the conductors and guard cables that will pass underneath the existing line. It is important to highlight that the topography in the crossing area presents elevation differences in both transversal and longitudinal directions. Then, the electromagnetic effects at the common critical points of both transmission lines on the ground are evaluated, considering various phase sequences in the projected line to show the influence of their selection. As a result, the main electromagnetic effect is the electric field since it directly affects the vertical separation between conductors and the ground. This effect is sensitive due to the superposition of fields produced in conjunction with the existing 500 kV transmission line. Additionally, induced voltages are evaluated when the 220 kV line is de-energized, and the influence of the crossing angle is demonstrated. In summary, the electric field generated at the intersection points of rights-of-way in the crossing area defines the phase sequence of the projected line. Consequently, the rest of the line must adhere to this restriction.
dc.descriptionTesis
dc.formatapplication/pdf
dc.languagespa
dc.publisherUniversidad Nacional de Ingeniería
dc.publisherPE
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rightshttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourceUniversidad Nacional de Ingeniería
dc.sourceRepositorio Institucional - UNI
dc.subjectEfectos electromagnéticos
dc.subjectCruce de líneas de transmisión
dc.subjectTensiones inducidas
dc.subjectSecuencia de fases
dc.subjectÁngulo de cruce de líneas
dc.subjecthttp://purl.org/pe-repo/ocde/ford#2.02.01
dc.titleAnálisis de los efectos electromagnéticos para el dimensionamiento del cruce de líneas de transmisión de 220 Kv y 500 Kv