dc.contributorCama Pelaez, Cesar Ulises
dc.creatorGarcia Paredes, Jesus Alberto
dc.creatorCama Pelaez, Cesar Ulises
dc.date.accessioned2024-04-17T13:41:13Z
dc.date.accessioned2024-05-02T21:25:15Z
dc.date.available2024-04-17T13:41:13Z
dc.date.available2024-05-02T21:25:15Z
dc.date.created2024-04-17T13:41:13Z
dc.date.issued2023
dc.identifierhttp://hdl.handle.net/20.500.12423/7168
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/9277348
dc.description.abstractEn esta investigación se estudia la prefactibilidad de una planta para producir ladrillos a partir de residuos de construcción y demolición en el distrito de Chiclayo, a raíz de que se observó grandes cantidades de desmonte ocasionando una contaminación visual y paisajística a los alrededores del distrito de Chiclayo, ocasionando problemas ambientales y sociales. Asimismo, tiene como objetivo general determinar la prefactibilidad de una planta de producción de ladrillo para el aprovechamiento de residuos de construcción y demolición. Los métodos del proyecto residieron en hacer un estudio de viabilidad comercial para calcular la demanda insatisfecha del proyecto, precio y características del producto, realizar un diseño técnico y tecnológico en el que se detalló paso a paso el proceso de rcd; también se hallaron indicadores y se utilizó el método de Guerchet para diseñar la planta, y una estimación económico-financiera de la propuesta para determinar la rentabilidad del proyecto. En los resultados se obtuvo que la mejor ubicación de la planta es a la salida de Chiclayo, camino al distrito de San José, a pesar de la viabilidad comercial y tecnológica, el proyecto no es viable financiera y económicamente obteniendo los siguientes resultados VAN (– S/362 286,23) y TIR (-21,8%), debido a la alta inversión de los equipos, maquinaria y costo del terreno implicado.
dc.description.abstractIn this investigation, the prefeasibility of a plant to produce waste from construction and demolition waste in the Chiclayo district is studied, as a result of which large amounts of clearing were observed, generating visual and landscape contamination in the surroundings of the Chiclayo district. causing environmental and social problems. Likewise, its general objective is to determine the prefeasibility of a waste production plant for the use of construction and demolition waste. The methodology of the project consisted of carrying out a commercial feasibility study to determine the unsatisfied demand of the project, price and characteristics of the product, carry out a technical and technological design in which the RCD process was detailed step by step; indicators were also found and the Guerchet method was used to design the plant, and an economic-financial evaluation of the proposal to determine the profitability of the project. As results, it was obtained that the plant will be located at the exit of the highway to the San José district; despite the commercial and technological viability, the project is not financially and economically viable, obtaining the following results VAN (– S/362,286.23) and TIR (21.8%), due to the high investment of the equipment, machinery and cost of the land involved.
dc.languagespa
dc.publisherUniversidad Católica Santo Toribio de Mogrovejo
dc.publisherPE
dc.rightshttp://creativecommons.org/licenses/by/4.0/
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectResiduos de construcción y demolición
dc.subjectGestión ambiental
dc.subjectViabilidad económica
dc.subjectConstruction and demolition waste
dc.subjectEnvironmental management
dc.subjectEconomic viability
dc.titleEstudio de prefactibilidad de una planta para producir ladrillo usando residuos de construcción y demolición en el distrito de Chiclayo
dc.typeinfo:eu-repo/semantics/bachelorThesis


Este ítem pertenece a la siguiente institución