dc.contributorHéctor Padilla
dc.creatorReconco, Jorge
dc.date2022-12-14T23:08:15Z
dc.date2022-12-14T23:08:15Z
dc.dateMayo-2019
dc.date2019
dc.date.accessioned2023-11-07T20:46:34Z
dc.date.available2023-11-07T20:46:34Z
dc.identifierDQ_33
dc.identifierhttps://repositorio.unitec.edu.hn//xmlui/handle/123456789/1733
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/9216922
dc.descriptionEl proceso de práctica profesional se llevó a cabo en la empresa Hormigón S de R. L. Fundada en_x000D_ 1994, Hormigón S de R.L. es una empresa especialista en pavimentos de concreto, pisos_x000D_ industriales, urbanizaciones, topografía, estampados, diseño, venta de concreto, renta de equipo,_x000D_ entre otros. Durante las once semanas de duración del proceso se desarrollaron distintas_x000D_ actividades que pusieron a prueba los conocimientos adquiridos en la carrera de Ingeniería civil,_x000D_ principalmente en el cálculo de cantidades de obra, rendimientos de equipo, mano de obra y_x000D_ materiales de campo. Se brindó también apoyo en la supervisión de obra en campo y el_x000D_ levantamiento de reportes diarios de avance de obra en el proyecto “Bodega Diunsa-Nestle”_x000D_ ubicado en la 33 calle, frente a “Las Torres Logistics Center”, sector “El Polvorín”. Dicho proyecto_x000D_ constaba en la pavimentación de aproximadamente 8,000 m2 compuestos desde la calle de_x000D_ acceso hacia las bodegas hasta el patio de maniobras para los contenedores. Primeramente, se_x000D_ llevó a cabo el trazado y nivelado de la zona para obtener los niveles de corte y de relleno. El corte_x000D_ y relleno se realizó con maquinaria de la empresa y también se requirió del alquiler de equipo._x000D_ Una vez nivelado el terreno se procedió a pavimentar según el diseño. El diseño requería de una_x000D_ subrasante debidamente compactada, seguida de una subbase de 0.15m de espesor y la cual_x000D_ debía de estar compuesta con material selecto. Finalmente, la carpeta de concreto hidráulico con_x000D_ diseño de 4000 psi y de 0.18m de espesor.||The process of professional practice was carried out in the company Hormigón S de R. L. Founded in_x000D_ 1994, Concrete S de R.L. is a company specializing in concrete pavements, floors_x000D_ industrial, urbanization, topography, prints, design, sale of concrete, rental of equipment,_x000D_ among others. During the eleven weeks of the process, different_x000D_ activities that tested the knowledge acquired in the Civil Engineering career,_x000D_ mainly in the calculation of quantities of work, performance of equipment, labor and_x000D_ field materials. Support was also provided in the supervision of work in the field and the_x000D_ compilation of daily progress reports on the project°Bodega Diunsa-Nestle"_x000D_ located on 33rd street, in front of°Las Torres Logistics Center",°El Polvorín" sector. said project_x000D_ consisted in the paving of approximately 8,000 m2 composed from the street of_x000D_ access to the warehouses to the maneuvering yard for containers. First of all, it_x000D_ carried out the tracing and leveling of the area to obtain the cut and fill levels. The cut_x000D_ and filling was carried out with the company's machinery and also required the rental of equipment._x000D_ Once the ground was leveled, paving was carried out according to the design. The design required a_x000D_ duly compacted subgrade, followed by a subbase 0.15m thick and which_x000D_ it must have been composed of select material. Finally, the hydraulic concrete layer with_x000D_ 4000 psi design and 0.18m thick.
dc.formatPDF
dc.formatapplication/pdf
dc.languageEspañol
dc.languagees-HN
dc.publisherUniversidad Tecnológica Centroaméricana UNITEC
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0/deed.es
dc.sourceUniversidad Tecnológica Centroaméricana UNITEC
dc.subjectConcreto||Topografía||Relleno
dc.titleProyecto: bodega diunsa-nestle, constructora hormigón S de R.L
dc.typePráctica Profesional
dc.coverageSan Pedro Sula, Cortés, Honduras.


Este ítem pertenece a la siguiente institución