dc.contributorHector Wilfredo Padilla Sierra
dc.creatorJosué Salomón Urbina Venegas
dc.date2023-01-05T18:50:06Z
dc.date2023-01-05T18:50:06Z
dc.date2020
dc.dateAbril-2020
dc.date.accessioned2023-11-07T20:44:33Z
dc.date.available2023-11-07T20:44:33Z
dc.identifierhttps://repositorio.unitec.edu/xmlui/handle/123456789/10229
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/9215956
dc.descriptionDados a los diferentes acuerdos que cuenta la Universidad Tecnológica Centroamericana, UNITEC, en este caso con CCW hay muchos aspectos técnicos que no pueden ser expuestos en este informe, se explicara los procesos constructivos de la etapa de Terracería y excavación del templo, como todas las actividades asignadas sin dar detalles explícitos, así como se acordó en la entrevista de CCW, y con el consentimiento de estos requisitos al decano de carrera Héctor Padilla. Durante la practica realizada en CCW construcción y supervisión de un templo Mormón, se realizaron diferentes actividades de seguimiento de procesos realizados por subcontratistas, se apoyó a los ingenieros de campo dando seguimiento al proceso de excavación y cálculos de volúmenes de material excavado y de zonas de acopio, se apoyó a los ingenieros de salud y seguridad inspeccionando requisitos de maquinarias y charlas de inducción, se ayudó en asignación de control de calidad digitalizando los procesos de terracería, se realizaron trabajos de estimaciones comparando licitaciones, identificando la cantidad de compras de cada inmobiliario especificado en los planos.
dc.descriptionGiven the different agreements that the Central American Technological University, UNITEC has, in this case with CCW there are many technical aspects that cannot be exposed in this report, the construction processes of the earthwork and excavation stage of the temple will be explained, as all the assigned activities without giving explicit details, as agreed in the CCW interview, and the consent of these requirements to the dean of career Héctor Padilla. During the practice carried out in CCW construction and supervision of a Mormon temple, different activities were carried out to monitor processes carried out by subcontractors, support was provided to field engineers by monitoring the excavation process and calculations of volumes of excavated material and areas of storage, health and safety engineers were supported by inspecting machinery requirements and induction talks, assisted in assigning quality control by digitizing earthwork processes, estimating work was carried out comparing tenders, identifying the amount of purchases of each real estate specified in the drawings.
dc.formatPDF
dc.languageEspañol
dc.languagees-HN
dc.publisherUniversidad Tecnológica Centroaméricana Unitec
dc.rightsAtribución-NoComercial-SinDerivadas 4.0 Internacional
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0/deed.es
dc.sourceUniversidad Tecnológica Centroaméricana UNITEC
dc.subjectCCW
dc.subjectConstrucción
dc.subjectTerracería
dc.titleInforme de practica profesional
dc.typePráctica Profesional
dc.coverageHonduras


Este ítem pertenece a la siguiente institución