dc.contributorHéctor Padilla
dc.creatorHawith García, Alejandro
dc.date2022-12-14T23:09:05Z
dc.date2022-12-14T23:09:05Z
dc.dateEnero-2019
dc.date2019
dc.date.accessioned2023-11-07T20:43:22Z
dc.date.available2023-11-07T20:43:22Z
dc.identifierDQ_61
dc.identifierhttps://repositorio.unitec.edu.hn//xmlui/handle/123456789/1762
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/9215389
dc.descriptionEl día22 de octubre se dio por iniciada la práctica profesional con la empresa Todo en Concreto en la construcción del edificio terminal y estacionamiento del Aeropuerto Internacional Palmerola (PIA).El proyecto consta de más de 37milmetros cuadrados de construcción de obra gris. Se trabajó con el departamento de ingeniería de la empresa.Durante el tiempo en la empresa se realizo inicialmente la supervisióninterna de los elementos en ejecución. Esta supervisión incluye:la revisión de armado de acero con su espaciamiento, diámetros de barra, posición y longitud de empalmes, y recubrimiento; la revisión del encofrado con sus espaciamientos, y recubrimientos; la revisión del procedimiento correcto de relleno; y la revisión de la preparación de las áreas a ser fundidas y revisión de las propiedades del concreto entregado. Posteriormente fue asignada la responsabilidad de una sección del edificio terminalcon todos los elementos que le corresponden. Por último,fue asignadael áreadel estacionamiento junto con la colaboración de la coordinaciónde los trabajos en el edificio terminal. Además,durante la práctica se realizaron distintos trabajos de cálculos de cantidades de obra, cubicaciones de concreto para fundición, levantamiento de elementos ya construidos para el cobro de contratos, logística y control de reparación y entrega de equipo de construcción entre otras actividades.||On October 22nd, the professional internship with Todo en Concreto started in the construction of the terminal building and parking lot of the Palmerola International Airport (PIA), which consists of more than 37,000 square meters of gray work construction. We worked with the engineering department of the company and during the time in the company we initially performed the internal supervision of the elements in execution. This supervision included: the review of steel reinforcement with its spacing, bar diameters, position and length of splices, and coating; the review of the formwork with its spacing, and coatings; the review of the correct backfilling procedure; and the review of the preparation of the areas to be cast and the review of the properties of the concrete delivered. Subsequently, she was assigned the responsibility for a section of the terminal building with all the corresponding elements. Finally, she was assigned to the parking lot area along with the collaboration of the coordination of the works in the terminal building. In addition, during the internship she performed various tasks such as calculations of quantities of work, concrete cubing for casting, survey of elements already built for the collection of contracts, logistics and control of repair and delivery of construction equipment, among other activities.
dc.formatPDF
dc.formatapplication/pdf
dc.languageEspañol
dc.languagees-HN
dc.publisherUniversidad Tecnológica Centroaméricana UNITEC
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0/deed.es
dc.sourceUniversidad Tecnológica Centroaméricana UNITEC
dc.subjectPalmerola||Empalmes||Concreto
dc.titleAeropuerto internacional palmerola
dc.typePráctica Profesional
dc.coverageSan Pedro Sula, Cortés, Honduras.


Este ítem pertenece a la siguiente institución