dc.contributorMejía, Lourdes
dc.creatorMayes, Alejandra
dc.date2022-12-14T23:08:51Z
dc.date2022-12-14T23:08:51Z
dc.dateOctubre-2018
dc.date2018
dc.date.accessioned2023-11-07T20:43:04Z
dc.date.available2023-11-07T20:43:04Z
dc.identifierDQ_41
dc.identifierhttps://repositorio.unitec.edu.hn//xmlui/handle/123456789/1755
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/9215240
dc.descriptionEl presente informe de práctica profesional se hablara sobre el trabajo realizado en la empresa_x000D_ constructora Grupo AIE, que tuvo una duración total de 10 semanas. Durante este tiempo se_x000D_ pusieron a prueba los conocimientos adquiridos durante el curso de la carrera de ingeniería civil_x000D_ en la Universidad Tecnológica Centroamérica (UNITEC)._x000D_ Durante la práctica, se mantuvo un contacto constante con los ingenieros y arquitectos de dicha_x000D_ empresa brindándoles apoyo en múltiples actividades y basando el trabajo realizado en sus_x000D_ conocimientos sobre los proyectos en los que se trabajó. Se realizó trabajo en las oficinas técnicas_x000D_ de dicha empresa, específicamente en el área de presupuestos. Así como también en las oficinas_x000D_ técnicas de BA Ingeniería y Termo Aire, empresas encargadas del diseño estructural y_x000D_ electromecánico de los proyectos de Grupo AIE._x000D_ En Grupo AIE se apoyó principalmente en la elaboración de presupuestos, así como también, en_x000D_ comparativos entre dos proyectos de plaza comerciales en El Salvador que quieren ser ejecutados_x000D_ en Costa Rica; se requería un costo generalizado de varios ítems para concluir si era óptimo llevar_x000D_ el proyecto o no a CR. Estos comparativos fueron realizados a actividades como supermercado,_x000D_ locales y pasillos, estructuras de techos, parqueos, pavimentos, entre otros._x000D_ En BA Ingeniería se apoyó en la revisión de vigas y columnas de proyectos de edificios, diseño de_x000D_ pérgolas y cimentaciones de Costa Rica. Así mismo, se mejoró el conocimiento en diseño_x000D_ estructural al recibir apoyo de los ingenieros estructurales presentes en la empresa. En Termo Aire_x000D_ se apoyó en diseño de bombas de agua potable, tanques de almacenamiento, diagramas_x000D_ unifilares eléctricos, canalización, y sistemas de rociadores automáticos de proyectos en Costa_x000D_ Rica y Panamá. Así como en BA Ingeniería, se enriqueció el conocimiento sobre el área_x000D_ electromecánica dentro de la ingeniería civil.||This professional practice report will talk about the work done in the company_x000D_ construction company Grupo AIE, which lasted a total of 10 weeks. During this time it_x000D_ tested the knowledge acquired during the course of the civil engineering career_x000D_ at the Central American Technological University (UNITEC)._x000D_ During the practice, constant contact was maintained with the engineers and architects of said_x000D_ company providing support in multiple activities and basing the work done on their_x000D_ Knowledge of the projects you worked on. Work was carried out in the technical offices_x000D_ of said company, specifically in the area of ​​budgets. As well as in the offices_x000D_ BA Engineering and Termo Aire, companies in charge of structural design and_x000D_ electromechanical of the AIE Group projects._x000D_ At Grupo AIE, support was provided mainly in the preparation of budgets, as well as in_x000D_ comparisons between two commercial plaza projects in El Salvador that want to be executed_x000D_ in Costa Rica; a generalized cost of several items was required to conclude if it was optimal to carry_x000D_ the project or not to CR. These comparisons were made to activities such as supermarket,_x000D_ premises and corridors, roof structures, parking lots, pavements, among others._x000D_ In BA Engineering, he supported himself in the revision of beams and columns of building projects, design of_x000D_ pergolas and foundations of Costa Rica. Likewise, knowledge in design was improved_x000D_ structure by receiving support from the structural engineers present in the company. In Thermo Air_x000D_ supported the design of drinking water pumps, storage tanks, diagrams_x000D_ electrical single lines, channeling, and automatic sprinkler systems for projects in Costa_x000D_ Rica and Panama. Just as in BA Engineering, knowledge about the area was enriched_x000D_ electromechanical within civil engineering.
dc.formatPDF
dc.formatapplication/pdf
dc.languageEspañol
dc.languagees-HN
dc.publisherUniversidad Tecnológica Centroaméricana UNITEC
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0/deed.es
dc.sourceUniversidad Tecnológica Centroaméricana UNITEC
dc.subjectLicitaciones||Mosquitia||Calidad
dc.titleGrupo aie
dc.typePráctica Profesional
dc.coverageSan Pedro Sula, Cortés, Honduras.


Este ítem pertenece a la siguiente institución