dc.descriptionEl presente proyecto de investigación tiene como propósito principal presentar las oportunidades de mejorar en el sistema de aire acondicionado (enfriamiento) actual de la central hidroeléctrica Francisco Morazán (CHFM), que permita alcanzar la temperatura óptima de operación en los ambientes de la planta, por medio de un análisis de eficiencia energética, para lograr determinar la prefactibilidad por medio de la realización de un estudio técnico financiero que muestre la viabilidad de reemplazar parcial o total el sistema de enfriamiento para lograr mejorar el desempeño energético en sala de máquinas de la CHFM y las condiciones operativas en los espacios de la central. La hipótesis de investigación para esta opción evaluada indica que, sí se reducirán los costos de operación y mantenimiento, así como el consumo energético de acuerdo con el cociente del IBC siendo este 1.16, mayor que uno. Se implementó una metodología con enfoque cuantitativo. Se realizó una evaluación económica para determinar la rentabilidad, los resultados demostraron que sí es posible implementar el proyecto de reemplazar el sistema de enfriamiento (dos chillers) que eficiente el consumo energético en sala de máquinas de la CHFM y reduzca los costos de operación y mantenimiento. El proyecto se ejecutará con fondos propios al 100%, la VAN da resultado mayor que cero L. 2,514,634.81 la TIR obtenida es del 24%, con un periodo de recuperación de 4 años.
dc.descriptionThe main purpose of this research project is to present the opportunities to improve the current air conditioning (cooling) system of the Francisco Morazán hydroelectric power plant (CHFM), which allows reaching the optimum operating temperature in the plant environments, by means of an energy efficiency analysis, to determine the pre-feasibility by conducting a financial technical study that shows the feasibility of partially or totally replacing the cooling system in order to improve energy performance in the CHFM engine room and the operating conditions in the plant's spaces. The research hypothesis for this evaluated option indicates that operation and maintenance costs will be reduced, as well as energy consumption according to the IBC ratio, being this 1.16, greater than one. A methodology with a quantitative approach was implemented. An economic evaluation was carried out to determine profitability. The results showed that it is possible to implement the project to replace the cooling system (two chillers) that will efficient energy consumption in the CHFM's engine room and reduce operation and maintenance costs. The project will be executed with 100% own funds, the NPV gives a result greater than zero L. 2,514,634.81 The IRR obtained is 24%, with a payback period of 4 years.
dc.formatPDF
dc.formatapplication/pdf
dc.languageEspañol
dc.languagees-HN
dc.publisherUniversidad Tecnológica Centroaméricana UNITEC
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0/deed.es
dc.sourceUniversidad Tecnológica Centroaméricana UNITEC
dc.subjectEnergía
dc.subjectSistemas de refrigeración de centrales hidroeléctricas
dc.subjectEficiencia energética
dc.titlePrefactibilidad de eficiencia energética en sistema de aire acondicionado en chfm