dc.contributor | Héctor Wilfredo Padilla Sierra | |
dc.creator | Verónica Jissel Reyes | |
dc.date | 2023-01-05T18:51:21Z | |
dc.date | 2023-01-05T18:51:21Z | |
dc.date | 2019 | |
dc.date | Septiembre-2019 | |
dc.date.accessioned | 2023-11-07T20:39:24Z | |
dc.date.available | 2023-11-07T20:39:24Z | |
dc.identifier | https://repositorio.unitec.edu/xmlui/handle/123456789/10295 | |
dc.identifier.uri | https://repositorioslatinoamericanos.uchile.cl/handle/2250/9213430 | |
dc.description | El presente informe busca exponer el trabajo realizado y los conocimientos adquiridos mediante el desarrollo de la práctica profesional realizada en la Empresa ALANZA CONSTRUCCIÓN. La práctica se realizó desde el día lunes 15 de julio del año 2019 hasta el día viernes 27 de septiembre del mismo año, cumpliendo una jornada laboral de 8 horas diarias de lunes a jueves y 7 horas el día viernes, completando un total de 428 horas trabajadas. También, se compartirán las múltiples tareas que fueron asignadas a lo largo de las once semanas, los trabajos realizados a partir del cálculo de un presupuesto para obras gris y estructura metálica de remodelaciones y construcciones de edificios, bodegas, naves industriales y plantas de tratamiento. Además, de los cálculos elaborados en oficina también se mencionarán las visitas de campo realizadas con los jefes del departamento con el fin de conocer la variedad de actividades que se realizan en la ejecución de un proyecto ya sea de pequeña o gran magnitud, también para verificar los detalles de la obra, ver condiciones del área, estructuras existentes y dificultades en el trabajo. Se podrá ver todo el desarrollo de un presupuesto y la ejecución de la obra. La diversidad de actividades realizadas durante este tiempo fue propicias para poder aprender tanto el trabajo ingenieril que se desarrolla en oficina, como las visitas a proyectos para observar y comprender los procesos constructivos que se realizan en un proyecto. | |
dc.description | This report seeks to present the work carried out and the knowledge acquired through the development of the professional practice carried out in the ALANZA CONSTRUCTION Company. The practice was carried out from Monday, July 15, 2019 to Friday, September 27 of the same year, fulfilling a working day of 8 hours a day from Monday to Thursday and 7 hours the Friday, completing a total of 428 hours worked. Also, the multiple tasks that were assigned throughout the eleven weeks, the work done from the calculation of a budget for gray works and metallic structure of remodeling and construction of buildings, warehouses, industrial buildings and treatment plants. Besides calculations made in the office will also mention the field visits made with the heads of the department in order to know the variety of activities that are carried out in the execution of a project whether small or large, also to verify the details of the work, see conditions of the area, existing structures and difficulties in the work. It will be possible see all the development of a budget and the execution of the work. The diversity of activities carried out during this time was conducive to being able to learn both the engineering work that takes place in the office, such as visits to projects to observe and understand the processes constructive that are carried out in a project. | |
dc.format | PDF | |
dc.format | application/pdf | |
dc.language | Español | |
dc.language | es-HN | |
dc.publisher | Universidad Tecnológica Centroaméricana UNITEC | |
dc.rights | Atribución-NoComercial-SinDerivadas 4.0 Internacional | |
dc.rights | https://creativecommons.org/licenses/by-nc-nd/4.0/deed.es | |
dc.source | Universidad Tecnológica Centroaméricana UNITEC | |
dc.subject | Ingeniería | |
dc.subject | Parque Industrial | |
dc.subject | Práctica Profesional | |
dc.title | ALANZA Construcción | |
dc.type | Práctica Profesional | |
dc.coverage | San Pedro Sula, Cortés, Honduras. | |