dc.relation | 430 Alvarez-Valdes, R., Fuertes, A., Tamarit, J. M., Giménez, G., & Ramos, R. (2005). A heuristic to schedule
431 flexible job-shop in a glass factory. European Journal of Operational Research, 165(2005), 525–534.
432 Baker, K. R. (2005). Elements of sequencing and scheduling. Hanover, NH: Tuck School of Business.
433 Barrios, M. A. O., Caballero, J. E., & Sánchez, F. S. (2015). A methodology for the creation of integrated service
434 networks in outpatient internal medicine. In Ambient intelligence for health (pp. 247–257). Springer.
435 Bozek, A., & Wysocki, M. (2015). Flexible job shop with continuous material flow. International Journal of
436 Production Research, 53(4), 1273–1290.
437 Brandimarte, P. (1993). Routing and scheduling in a flexible job shop by Tabu search. Annals of Operations
438 Research, 41(3), 157–183.
439 Calleja, G., & Pastor, R. (2014). A dispatching algorithm for flexible job-shop scheduling with transfer batches:
440 An industrial application. Production Planning & Control, 25(2), 93–109.
441 De Felice, F., & Petrillo, A. (2013). Simulation approach for the optimization of the layout in a manufacturing
442 firm. 24th IASTED international conference on modelling and simulation, MS 2013; Banff, AB; Canada;
443 17 July 2013 through 19 July 2013 (pp. 152–161).
444 Demir, Y., & I¸sleyen, S. K. (2014). An effective genetic algorithm for flexible job-shop scheduling with
445 overlapping in operations. International Journal of Production Research, 52(13), 3905–3921.
446 Digiesi, S., Mossa, G., & Mummolo, G. (2013). A sustainable order quantity model under uncertain product
447 demand. 7th IFAC conference on manufacturing modelling, management, and control, MIM 2013 (pp.
448 664–669). Saint Petersburg; Russian Federation; 19 June–21 June.
449 Fattahi, F., & Fallahi, A. (2010). Dynamic scheduling in flexible job shop systems by considering simultane450 ously efficiency and stability. CIRP Journal of Manufacturing Science and Technology, 2, 114–123.
451 Fattahi, P., Hosseini, S. M. H., Jolai, F., & Tavakkoli-Moghaddam, R. (2014). A branch and bound algorithm
452 for hybrid flow shop scheduling problem with setup time and assembly operations. Applied Mathematical
453 Modelling, 38, 119–134.
454 Gholami, O., & Sotskov, Y. N. (2014). Solving parallel machines job-shop scheduling problems by an adaptive
455 algorithm. International Journal of Production Research, 52(13), 3888–3904.
456 Guo, W. J. (2006). Algorithms for two-stage flexible flow shop scheduling with fuzzy processing times. NanJing:
457 NanJing University of Science & Technology.
458 Hassin, R., & Shani, M. (2005). Machine scheduling with earliness, tardiness and nonexecution penalties.
459 Computers & Operations Research, 32, 683–705.
460 Herazo-Padilla, N., Montoya-Torres, J. R., Isaza, S. N., & Alvarado-Valencia, J. (2015). Simulation461 optimization approach for the stochastic location-routing problem. Journal of Simulation, 9(4), 296–311.
462 Hildebrandt, T., Heger, J., & Scholz-Reiter, B. (2010). Towards improved dispatching rules for complex shop
463 floor scenarios—A genetic programming approach. GECCO’10, July 7–11, 2010. Portland, Oregon,
464 USA.
465 Hu, H. (2015). Adaptive scheduling model in hybrid flowshop production control using petri net. International
466 Journal of Control and Automation, 8(1), 233–242.
467 Jansen K, Mastrolilli M, & Solis-Oba R, (2000). Approximation algorithms for Flexible Job Shop Problems.
468 In: Lecture notes in computer science, Vol. 1776. Proceedings of the fourth Latin American symposium
469 on theoretical informatics (pp. 68–77). Berlin: Springer.
470 Jungwattanakit, J., Reodecha, M., Chaovalitwongse, P., & Werner, F. (2009). A comparison of scheduling
471 algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual
472 criteria. Computers and Operations Research, 36(2), 358–378.
473 Kacem, I., Hammadi, S., & Borne, P. (2002). Pareto-optimality Approach for Flexible Job-shop Scheduling
474 Problems: Hybridization of Evolutionary Algorithms and Fuzzy Logic. Journal of Mathematics and
475 Computers in Simulation
476 Karimi-Nasab, M., & Modarres, M. (2015). Lot sizing and job shop scheduling with compressible process
477 times: A cut and branch approach. Computers & Industrial Engineering, 85, 196–205.
478 Kurz, M. E., & Askin, R. G. (2004). Scheduling flexible flow lines with sequence dependent setup times.
479 European Journal of Operational Research, 159(1), 66–82.
480 Logendran, R., Carson, S., & Hanson, E. (2005). Grouping scheduling in flexible flow shops. International
481 Journal of Production Economics, 96(2), 143–155.
482 Pezzella, F., Morganti, G., & Ciaschetti, G. (2008). A genetic algorithm for the Flexible Job-shop Scheduling
483 Problem. Computers & Operations Research, 35, 3202–3212.
484 Pinedo, M. (2001). Scheduling: Theory, algorithms, and systems. Upper Saddle River, NJ: Prentice Hall.
485 Prot, D., Bellenguez-Morineau, O., & Lahlou, C. (2013). New complexity results for parallel identical machine
486 scheduling problems with preemption, release dates and regular criteria. European Journal of Operational
487 Research, 231, 282–287.
488 Riane, F., Artiba, A., & Elmaghraby, S. E. (2002). Sequencing a hybrid two-stage flow shop with dedicated
489 machines. Int. J. Prod. Res., 40, 4353–4380.
490 Shen, X.-N., & Yao, X. (2015). Mathematical modeling and multi-objective evolutionary algorithms applied
491 to dynamic flexible job shop scheduling problems. Information Sciences, 298, 198–224.
492 Sotskov, Y. N., & Gholami, O. (2015). Mixed graph model and algorithms for parallel-machine job-shop
493 scheduling problems. International Journal of Production Research, 55(6), 1549–1564.
494 Sun, D.-H., He, W., Zheng, L.-J., & Liao, X.-Y. (2014). Scheduling flexible job shop problem subject to machine
495 breakdown with game theory. International Journal of Production Research, 52(13), 3858–3876.
496 Türkylmaz, A., & Bulkan, S. (2015). A hybrid algorithm for total tardiness minimization in flexible job shop:
497 Genetic algorithm with parallel VNS execution. International Journal of Production Research, 53(6),
498 1832–1848.
499 Wang, S., & Liu, M. (2013). A heuristic method for two-stage hybrid flow shop with dedicated machines.
500 Computers & Operations Research, 40, 438–450.
501 Yokoyama, M. (2004). Scheduling for two-stage production system with setup and assembly operations.
502 Computers & Operations Research, 31, 2063–2078. | |