dc.creatorCanto, Juliana Lorensi do
dc.creatorMachado, Carlos Cardoso
dc.creatorSeixas, Fernando
dc.creatorSouza, Amaury Paulo de
dc.creatorSant' Anna, Cleverson de Mello
dc.date2017-12-20T15:49:52Z
dc.date2017-12-20T15:49:52Z
dc.date2011-10-31
dc.date.accessioned2023-09-27T20:48:25Z
dc.date.available2023-09-27T20:48:25Z
dc.identifier1806-9088
dc.identifierhttp://dx.doi.org/10.1590/S0100-67622011000700019
dc.identifierhttp://www.locus.ufv.br/handle/123456789/15836
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/8948360
dc.descriptionOs objetivos deste trabalho foram avaliar o desempenho e estimar os custos de um sistema de cavaqueamento de ponteiras de eucalipto, resultantes de colheita florestal, para aproveitamento energético em uma empresa de base florestal localizada no Estado do Pará, na Região Norte do Brasil. O sistema era composto por um picador florestal, dois tratores florestais transportadores autocarregáveis (com grua) e uma carregadora frontal. A coleta de dados baseou-se em estudo de tempos e movimentos, determinação do consumo de combustível e pesagem dos cavacos produzidos. A produtividade média do sistema foi de 17,51 toneladas por hora efetiva. A eficiência operacional foi de 51,9%, devido a diversas demoras operacionais, principalmente para conserto e manutenção do picador. O transporte de cavacos foi considerado o ponto de estrangulamento do sistema, devido a ocorrências de falta de caminhão disponível no local para o carregamento. O sistema pode produzir entre 94 e 162 vezes mais energia do que consome. O custo do sistema por hora efetiva foi de R$376,56, o que representa R$21,51/t de cavacos ou R$2,70/GJ.
dc.descriptionThe objective of this study was to evaluate the performance and to estimate costs of a wood chipping system for tree tops, which are considered residuals from wood harvesting, to be used for energy. The study was developed in a forest industry in the Para State, located in the north region of Brazil. The system was comprised by one wood chipper, two forwarders and one front loader. Data collection was based on time study, fuel consumption and chips load weighting. System average productivity was 17.51 tonnes per effective hour. Machine utilization rate was 51.9% due to many delays, mainly for repair and maintenance of the chipper. Chips transportation was considered to be the critical point of the system, due to some lack of trucks available for blowing chips. The system can produce between 94 and 162 times more energy than the energy consumed. System cost per effective hour was R$ 376.56, which means R$ 21.51/tonne of chips or R$ 2.70/GJ.
dc.formatpdf
dc.formatapplication/pdf
dc.languagepor
dc.publisherRevista Árvore
dc.relationv.35, n.6, p.1327-1334, nov./dez. 2011
dc.rightsOpen Access
dc.subjectBiomassa florestal
dc.subjectPicador e energia renovável
dc.titleAvaliação de um sistema de cavaqueamento de ponteiras de eucalipto para aproveitamento energético
dc.typeArtigo


Este ítem pertenece a la siguiente institución