Otro
Optimal reactive power dispatch using stochastic chance-constrained programming
Registro en:
Proceedings of the 2012 6th IEEE/PES Transmission and Distribution: Latin America Conference and Exposition, T and D-LA 2012.
10.1109/TDC-LA.2012.6319093
WOS:000310427700047
2-s2.0-84869843050
Autor
López, Julio C.
Muñoz, José I.
Contreras, Javier
Mantovani, J. R. S.
Resumen
Deterministic Optimal Reactive Power Dispatch problem has been extensively studied, such that the demand power and the availability of shunt reactive power compensators are known and fixed. Give this background, a two-stage stochastic optimization model is first formulated under the presumption that the load demand can be modeled as specified random parameters. A second stochastic chance-constrained model is presented considering uncertainty on the demand and the equivalent availability of shunt reactive power compensators. Simulations on six-bus and 30-bus test systems are used to illustrate the validity and essential features of the proposed models. This simulations shows that the proposed models can prevent to the power system operator about of the deficit of reactive power in the power system and suggest that shunt reactive sourses must be dispatched against the unavailability of any reactive source. © 2012 IEEE.
Materias
Ítems relacionados
Mostrando ítems relacionados por Título, autor o materia.
-
Optimal reactive power dispatch using stochastic chance-constrained programming
Universidade Estadual Paulista (Unesp); Universidad de Castilla - La Mancha (2012-11-27)Deterministic Optimal Reactive Power Dispatch problem has been extensively studied, such that the demand power and the availability of shunt reactive power compensators are known and fixed. Give this background, a two-stage ... -
Optimal reactive power dispatch using stochastic chance-constrained programming
Universidade Estadual Paulista (Unesp); Universidad de Castilla - La Mancha (2012-11-27)Deterministic Optimal Reactive Power Dispatch problem has been extensively studied, such that the demand power and the availability of shunt reactive power compensators are known and fixed. Give this background, a two-stage ... -
Optimal Reactive Power Planning Using Two-Stage Stochastic Chance-Constrained Programming
Universidade Estadual Paulista (Unesp); Univ Castilla La Mancha (Ieee, 2013-01-01)In this paper, the optimal reactive power planning considering uncertainty is presented. The classical deterministic mixed-integer nonlinear model is expanded into two-stage stochastic model with chance-constraint. This ...