dc.contributor | Gutiérrez Bucheli, Laura Andrea | |
dc.creator | Porras Rodríguez, Juan Sebastián | |
dc.date.accessioned | 2022-09-26T22:27:27Z | |
dc.date.accessioned | 2023-09-07T00:45:08Z | |
dc.date.available | 2022-09-26T22:27:27Z | |
dc.date.available | 2023-09-07T00:45:08Z | |
dc.date.created | 2022-09-26T22:27:27Z | |
dc.date.issued | 2017 | |
dc.identifier | http://hdl.handle.net/1992/61592 | |
dc.identifier | instname:Universidad de los Andes | |
dc.identifier | reponame:Repositorio Institucional Séneca | |
dc.identifier | repourl:https://repositorio.uniandes.edu.co/ | |
dc.identifier | 795310-1001 | |
dc.identifier.uri | https://repositorioslatinoamericanos.uchile.cl/handle/2250/8727736 | |
dc.description.abstract | "Los retrasos son el problema más común y también más costoso en los proyectos de construcción. En este paper se estudia los retrasos y sobrecostos del contrato de obra 005 de 2012 por el objeto de construcción de la intersección a desnivel de la avenida Laureano Gómez (Ak 9) por calle 94 y su conexión con la avenida Santa Bárbara (Ak 19) en Bogotá D.C; para hacer un resumen general de las causas y clasificarlas por cada año para encontrar la correlación entre los retrasos y adiciones presentadas en el contrato. Además, se comparó los desvíos de tiempo y costo con varios estudios de contratos en Colombia y Estados Unidos para medir el mal manejo del proyecto paralelo a otros escenarios." -- Tomado del Formato de Documento de Grado. | |
dc.description.abstract | "Delays are the most common and most costly problem in construction projects. In this paper we study delays and cost overruns of the construction contract 005 of 2012 for the construction of the intersection of Laureano Gómez avenue (ak 9) on 94th street and its connection with Santa Barbara avenue (ak 19) in Bogotá D.C?; to make a general summary of the causes and sort throughout each year to find the correlation between delays and cost additions presented in the contract. In addition, time and cost deviations were compared with several contract studies in Colombia and the United States to measure project management in parallel with other scenarios." -- Tomado del Formato de Documento de Grado. | |
dc.language | spa | |
dc.publisher | Universidad de los Andes | |
dc.publisher | Ingeniería Civil | |
dc.publisher | Facultad de Ingeniería | |
dc.publisher | Departamento de Ingeniería Civil y Ambiental | |
dc.rights | Al consultar y hacer uso de este recurso, está aceptando las condiciones de uso establecidas por los autores. | |
dc.rights | https://repositorio.uniandes.edu.co/static/pdf/aceptacion_uso_es.pdf | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights | http://purl.org/coar/access_right/c_abf2 | |
dc.title | Análisis de retrasos y sobrecostos del contrato de construcción de la intersección a desnivel de la avenida Laureano Gómez (AK9) por calle 94 y su conexión con la avenida Santa Bárbara (AK19) en Bogotá D.C | |
dc.type | Trabajo de grado - Pregrado | |