dc.relation | [1] S. F. de C. SFC, “Conceptos de Crédito,” 2020. https://www.superfinanciera.gov.co/jsp/Publicaciones/publicaciones/loadContenidoPublicacion/id/60956/reAncha/1/c/60957 [2] Congreso de la República de Colombia, Decreto_663_De_1993. 1993, p. 1. [3] S. Nigel, E. P. Robinson, and F. Sahin, Operations management, Séptima ed. 2013. doi: 10.4135/9781412976169.n10. [4] J. Botero, H. López, C. E. Posada, C. Ballesteros, and J. García, Economía Colombiana: Análisis de conyuntura, 1st ed. Medellín: EAFIT, 2015. [5] Asobancaria, “Informe de sostenibilidad Asobancaria. Acercando la banca a los colombianos.,” Bogotá D.C, 2018. [6] Superintendencia Financiera de Colombia, “Saldo de Cartera por Producto e Indicador de Calidad por Mora, octubre de 2022,” 2022. [Online]. Available: https://www.superfinanciera.gov.co/inicio/informes-y-cifras/cifras/establecimientos-de-credito/informacion-peri [7] P. Harmon, “The state of business process management,” 2019. doi: 10.1016/b978-0-12-815847-0.00018-2. [8] Ernst & Young, “Épica historias de usuario proyecto Datawarehouse Banco ABC,” 2018. [9] S. F. de C. SFC, “III Publicación de Reportes Recientes del Sector Financiero,” 2019. [10] Corte constitucional and Consejo Superior de la Judicatura, Constitución Política de Colombia 1991. Actualizada con los Actos Legislativos a 2016. 2016, pp. 1–170. [11] A. Asociación Nacional de Industriales, “Marco Legal del sistema financiero colombiano,” Régimen bancario en Colombia. pp. 197–400, 2018. doi: 10.2307/j.ctt1k233x9.7. [12] Congreso de Colombia, “Ley 1328 De 2009,” J Chem Inf Model, vol. 53, no. julio 15, p. 160, 1989, doi: 10.1017/CBO9781107415324.004. [13] N. M. S. Issuers, B. B. F. S. A, E. Distribuidora, N. S. A. Edenor, P. E. S. A, and Y. P. F. S. Anónima, “Current List of All Non-U . S . Issuers,” 2019. [14] S. F. de C. SFC, “Propósito Superior de la Superintendencia Financiera de Colombia,” Acerca de la SFC, 2020. https://www.superfinanciera.gov.co/jsp/Publicaciones/publicaciones/loadContenidoPublicacion/id/60607/f/0/c/00#funciones2 [15] S. F. de C. SFC, “Normativa para establecimientos de crédito,” 2016. https://www.superfinanciera.gov.co/publicacion/61547 [16] S. F. de C. SFC, “Página Web Superintendencia Financiera de Colombia,” 2021. https://www.superfinanciera.gov.co/jsp/index.jsf [17] Asobancaria, “Generalidades Asobancaria,” 2016. https://www.asobancaria.com [18] C. Banco de la Republica, “Las funciones del Banco de la República en relación con el Gobierno,” 2014. [19] F. para el F. del S. A. FINAGRO, “Información institucional Finagro,” 2020. https://www.finagro.com.co/quiénes-somos/información-institucional [20] FONADE, “Fondo Financiero de Proyectos de Desarrollo,” 2015. https://encolombia.com/economia/economiacolombiana/emp-turisticos/fondofinanciero/ [21] Bancóldex, “¿Qué es Bancóldex?,” 2018. [22] Bancóldex, “¿qué es Bancóldex?,” 2018. [23] M. E. Porter, Ventaja competitiva, First. New York, 1985. [24] C. Rodríguez, “Qué es Business Process Management (BPM). Definiciones y conceptos,” Revista de la Escuela Colombiana de Ingeniería, vol. 98, no. 25, pp. 23–29, 2015. [25] M. Dumas, M. La Rosa, J. Mendling, and H. a. Reijers, Fundamentals of Business Process Management, First. Berlin, Heidelberg: Springer Berlin Heidelberg, 2013. doi: 10.1007/978-3-642-33143-5. [26] C. Y. Rodríguez-Rios and J. E. Roa-Sánchez, “Model to measure the effect of the integration of information in business processes. Example: bidding process for an industry,” Business Process Management Journal, vol. ahead-of-p, no. ahead-of-print., pp. 1–32, 2021, doi: 10.1108/BPMJ-09-2020-0432. [27] E. Damaggio, A. Deutsch, R. Hull, and V. Vianu, “Automatic verification of data-centric business processes,” Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), vol. 6896 LNCS, pp. 3–16, 2011, doi: 10.1007/978-3-642-23059-2_3. [28] Chen, “The entity-relationship model: Toward a unified view of data,” ACM SIGIR Forum, vol. 10, no. 3, p. 9, 1975, doi: 10.1145/1095277.1095279. [29] M. Weske, Business process management: Concepts, languages, architectures. 2007. doi: 10.1007/978-3-540-73522-9. [30] M. Hammer and J. Champy, Reengineering Corporation. Springer, 1993. [31] H. Smith and P. Fingar, “Business Process Management (BPM): The Third Wave,” The Bottom Line, vol. 16, no. 3, pp. 34–46, 2003, doi: 10.1108/bl.2003.17016cae.004. [32] A. H. Van De and M. S. Poole, “Explaining Development and Change in Organizations.,” Academy of Management Review, vol. 20, no. 3, pp. 510–540, 1995, doi: 10.5465/amr.1995.9508080329. [33] P. Harmon, Business Process Change_ A Manager’s Guide to Improving, Redesigning, and. Morgan Kaupmann Publishers, 2003. [34] I. DeToro and T. McCabe, “How to stay flexible and elude fads,” Qual Prog, vol. 30, no. 3, pp. 55–60, 1997. [35] F. D’Alessio, Administración y dirección de la producción, Segunda ed. Naucalpan de Juárez: Pearson Educación de México, 2004. [36] S. Nahmias, Análisis de la producción y las operaciones, 5ta Edición, Quinta edi. McGraw-Hill, 2007. [37] M. L. Pinedo, Scheduling. Theory, Algorithms, and Systems, Tercera ed., vol. 53, no. 9. New York, USA: Stern School of Business, New York University, 2013. doi: 10.1017/CBO9781107415324.004. [38] M. L. Pinedo, Scheduling. Theory, Algorithms, and Systems, Tercera ed., vol. 53, no. 9. New York, USA: Stern School of Business, New York University, 2013. doi: 10.1017/CBO9781107415324.004. [39] J. Castaño, “Actualidad del sistema financiero Colombiano,” Cali, 2018. [40] A. H. Chowdhury and M. Z. Rahman, “Application of Line Balancing Method for Service Process Improvement: The Case of a Bank in Bangladesh,” South Asian Journal of Management, vol. 17, no. 2, pp. 137–159, 2010. [41] H. Fazlollahtabar, H. Hajmohammadi, and A. Es’Haghzadeh, “A heuristic methodology for assembly line balancing considering stochastic time and validity testing,” International Journal of Advanced Manufacturing Technology, vol. 52, no. 1–4, pp. 311–320, 2011, doi: 10.1007/s00170-010-2708-1. [42] J. C. Chen, Y. Y. Chen, T. L. Chen, and Y. H. Kuo, “Applying two-phase adaptive genetic algorithm to solve multi-model assembly line balancing problems in TFT–LCD module process,” J Manuf Syst, vol. 52, no. May, pp. 86–99, 2019, doi: 10.1016/j.jmsy.2019.05.009. [43] M. Salehi, H. R. Maleki, and S. Niroomand, “A multi-objective assembly line balancing problem with worker’s skill and qualification considerations in fuzzy environment,” Applied Intelligence, vol. 48, no. 8, pp. 2137–2156, 2018, doi: 10.1007/s10489-017-1065-2. [44] A. Scholl, N. Boysen, and M. Fliedner, “The assembly line balancing and scheduling problem with sequence-dependent setup times: Problem extension, model formulation and efficient heuristics,” OR Spectrum, vol. 35, no. 1, pp. 291–320, 2013, doi: 10.1007/s00291-011-0265-0. [45] T. Kellegöz, “Balancing Lexicographic Multi-Objective Assembly Lines with Multi-Manned Stations,” Math Probl Eng, vol. 2016, 2016, doi: 10.1155/2016/9315024. [46] M. Bagher, M. Zandieh, and H. Farsijani, “Balancing of stochastic U-type assembly lines: An imperialist competitive algorithm,” International Journal of Advanced Manufacturing Technology, vol. 54, no. 1–4, pp. 271–285, 2011, doi: 10.1007/s00170-010-2937-3. [47] A. Baykasoǧlu, “Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems,” J Intell Manuf, vol. 17, no. 2, pp. 217–232, 2006, doi: 10.1007/s10845-005-6638-y. [48] G. A. Widyadana, “Multi Objective Model for Balancing U-Type Assembly Line With Permanent and Temporary Workers,” Jurnal Teknik Industri, vol. 11, no. 1, pp. 33–42, 2009, doi: 10.9744/jti.11.1.pp.33-42. [49] A. Baykasoǧlu and L. Özbakir, “Stochastic U-line balancing using genetic algorithms,” International Journal of Advanced Manufacturing Technology, vol. 32, no. 1–2, pp. 139–147, 2007, doi: 10.1007/s00170-005-0322-4. [50] M. Rabbani, M. Montazeri, H. Farrokhi-Asl, and H. Rafiei, “A multi-objective genetic algorithm for a mixed-model assembly U-line balancing type-I problem considering human-related issues, training, and learning,” Journal of Industrial Engineering International, vol. 12, no. 4, pp. 485–497, 2016, doi: 10.1007/s40092-016-0158-6. [51] P. Sivasankaran and P. Shahabudeen, “Literature review of assembly line balancing problems,” International Journal of Advanced Manufacturing Technology, vol. 73, no. 9–12, pp. 1665–1694, 2014, doi: 10.1007/s00170-014-5944-y. [52] H. Triki, A. Mellouli, and F. Masmoudi, “A multi-objective genetic algorithm for assembly line resource assignment and balancing problem of type 2 (ALRABP-2),” J Intell Manuf, vol. 28, no. 2, pp. 371–385, 2017, doi: 10.1007/s10845-014-0984-6. [53] M. Gen, W. Zhang, L. Lin, and Y. S. Yun, “Recent advances in hybrid evolutionary algorithms for multiobjective manufacturing scheduling,” Comput Ind Eng, vol. 112, pp. 616–633, 2017, doi: 10.1016/j.cie.2016.12.045. [54] Li and T. Boucher, “Assembly line balancing problem with task learning and dynamic task reassignment,” International Journal of Advanced Manufacturing Technology, vol. 88, no. 9–12, pp. 3089–3097, 2017, doi: 10.1007/s00170-016-9014-5. [55] B. Zhang, L. Xu, and J. Zhang, “A multi-objective cellular genetic algorithm for energy-oriented balancing and sequencing problem of mixed-model assembly line,” J Clean Prod, vol. 1, no. 1, pp. 1–16, 2019, doi: 10.1016/j.jclepro.2019.118845. [56] M. Rocha, J. F. Oliveira, and M. A. Carravilla, “A constructive heuristic for staff scheduling in the glass industry,” Ann Oper Res, vol. 217, no. 1, pp. 463–478, 2014, doi: 10.1007/s10479-013-1525-y. [57] J. Liu et al., “An improved multi-objective discrete bees algorithm for robotic disassembly line balancing problem in remanufacturing,” International Journal of Advanced Manufacturing Technology, vol. 97, no. 9–12, pp. 3937–3962, 2018, doi: 10.1007/s00170-018-2183-7. [58] S. Masood, “Line balancing and simulation of an automated production transfer line,” Assembly Automation, vol. 26, no. 1, pp. 69–74, 2006, doi: 10.1108/01445150610645684. [59] M. Chueprasert and P. Ongkunaruk, “Productivity improvement based line balancing: A case study of pasteurized milk manufacturer,” Int Food Res J, vol. 22, no. 6, pp. 2313–2317, 2015. [60] L. Hou, Y. M. Wu, R. S. Lai, and C. T. Tsai, “Product family assembly line balancing based on an improved genetic algorithm,” International Journal of Advanced Manufacturing Technology, vol. 70, no. 9–12, pp. 1775–1786, 2014, doi: 10.1007/s00170-013-5425-8. [61] T. Al-Hawari, M. Ali, O. Al-Araidah, and A. Mumani, “Development of a genetic algorithm for multi-objective assembly line balancing using multiple assignment approach,” International Journal of Advanced Manufacturing Technology, vol. 77, no. 5–8, pp. 1419–1432, 2015, doi: 10.1007/s00170-014-6545-5. [62] J. J. Lyu, “A Single-Run Optimization Algorithm for Stochastic Assembly Line Balancing Problems,” J Manuf Syst, vol. 16, no. 3, pp. 204–210, 1997, doi: 10.1016/s0278-6125(97)81719-0. [63] D. Li, C. Zhang, X. Shao, and W. Lin, “A multi-objective TLBO algorithm for balancing two-sided assembly line with multiple constraints,” J Intell Manuf, vol. 27, no. 4, pp. 725–739, 2016, doi: 10.1007/s10845-014-0919-2. [64] L. P. Ding, Y. X. Feng, J. R. Tan, and Y. C. Gao, “A new multi-objective ant colony algorithm for solving the disassembly line balancing problem,” International Journal of Advanced Manufacturing Technology, vol. 48, no. 5–8, pp. 761–771, 2010, doi: 10.1007/s00170-009-2303-5. [65] N. Manavizadeh, M. Rabbani, and F. Radmehr, “A new multi-objective approach in order to balancing and sequencing U-shaped mixed model assembly line problem: a proposed heuristic algorithm,” International Journal of Advanced Manufacturing Technology, vol. 79, no. 1–4, pp. 415–425, 2015, doi: 10.1007/s00170-015-6841-8. [66] M. C. Villarreal and P. Keskinocak, “Staff planning for operating rooms with different surgical services lines,” Health Care Manag Sci, vol. 19, no. 2, pp. 144–169, 2016, doi: 10.1007/s10729-014-9307-x. [67] R. Cordone, P. Hosteins, G. Righini, P. Ravizza, and A. Piselli, “Optimal selection of contracts and work shifts in multi-skill call centers,” EURO Journal on Computational Optimization, vol. 2, no. 4, pp. 247–277, 2014, doi: 10.1007/s13675-013-0019-7. [68] M. N. Janardhanan, Z. Li, and P. Nielsen, “Model and migrating birds optimization algorithm for two-sided assembly line worker assignment and balancing problem,” Soft comput, vol. 8, 2018, doi: 10.1007/s00500-018-03684-8. [69] G. Ongena and P. Ravesteyn, “Business process management maturity and performance: A multi group analysis of sectors and organization sizes,” Business Process Management Journal, 2019, doi: 10.1108/BPMJ-08-2018-0224. [70] J. Becker, P. Bergener, M. Räckers, B. Weiß, and A. Winkelmann, “Pattern-based semi-automatic analysis of weaknesses in semantic business process models in the banking sector,” 18th European Conference on Information Systems, ECIS 2010, 2010. [71] J. Ruževičius, I. Milinavičiūtė, and D. Klimas, “Peculiarities Of The Business Process Management Lifecycle At Different Maturity Levels: The Banking Sector’s Case,” Issues of Business and Law, vol. 4, no. 2012, pp. 69–85, 2012, doi: 10.5200/ibl.2012.07. [72] P. Trkman, “The critical success factors of business process management,” Int J Inf Manage, vol. 30, no. 2, pp. 125–134, 2010, doi: 10.1016/j.ijinfomgt.2009.07.003. [73] P. Küng and C. Hagen, “The fruits of Business Process Management: An experience report from a Swiss bank,” Business Process Management Journal, vol. 13, no. 4, pp. 477–487, 2007, doi: 10.1108/14637150710763522. [74] K. Randeree, A. Mahal, and A. Narwani, “A business continuity management maturity model for the UAE banking sector,” Business Process Management Journal, vol. 18, no. 3, pp. 472–492, 2012, doi: 10.1108/14637151211232650. [75] B. U. Homann and M. Rill, “Flexible Value Structures in banking,” Commun ACM, vol. 47, no. 5, pp. 3–5, 2004. [76] P. Küng, C. Hagen, M. Rodel, and S. Seifert, “Business process monitoring & measurement in a large bank: Challenges and selected approaches,” Proceedings - International Workshop on Database and Expert Systems Applications, DEXA, vol. 2006, pp. 955–961, 2005, doi: 10.1109/DEXA.2005.60. [77] J. Becker, B. Weiß, and A. Winkelmann, “Developing a business process modeling language for the banking sector - A design science approach,” 15th Americas Conference on Information Systems 2009, AMCIS 2009, vol. 9, pp. 6136–6146, 2009. [78] W. Bandara, C. Abbott, P. Mathiesen, L. Meyers, and M. Nagra, “Developing enterprise-wide business process management capability: a teaching case from the financial sector,” Journal of Information Technology Teaching Cases, vol. 8, no. 2, pp. 192–208, 2018, doi: 10.1057/s41266-018-0034-x. [79] M. Vojvodic and C. Hitz, “Business Process Management tools as measure of customer centric maturity,” in The European Proceedings of Social & Behavioural Sciences, 2019, p. 12. [80] H. Zupan and N. Herakovic, “Production line balancing with discrete event simulation: A case study,” in IFAC-PapersOnLine, May 2015, vol. 28, no. 3, pp. 2305–2311. doi: 10.1016/j.ifacol.2015.06.431. [81] Facultat d’Informàtica de Barcelona (Universitat Politècnica de Catalunya) and L’Illa Diagonal, “Simulación, La simulación por ordenador,” 2018. Accessed: Jan. 26, 2023. [Online]. Available: https://www.fib.upc.edu/retro-informatica/avui/simulacio.html [82] W. Danilczuk, “line balancing problem, manufacturing simulation, Tecnomaix Plant Simulation, manufacturing, production system modeling THE USE OF SIMULATION ENVIRONMENT FOR SOLVING THE ASSEMBLY LINE BALANCING PROBLEM,” Applied Computer Science, vol. 14, no. 1, pp. 42–52, doi: 10.23743/acs-2018-04. [83] M. Pröpster, L. März, G. Reinhart, and C. Intra, “Validation of line balancing by simulation of workforce flexibility,” in Procedia CIRP, 2015, vol. 33, pp. 93–98. doi: 10.1016/j.procir.2015.06.018. [84] M. Kuncova and M. Zajoncova, “Discrete event simulation usage to model and optimize the production line,” MM Science Journal, vol. 2018, no. March, pp. 2325–2332, Mar. 2018, doi: 10.17973/MMSJ.2018_03_2017117. [85] Dimas Novrisal, Nuraida Wahyuni, Nadia Hamani, and Abderrahman El Mhamedi, “Simulation of New System Departure Terminal Soekarno-Hatta International Airport,” Applied Mechanics and Materials, 2015. [86] R. K. Yin, Case Study Research Design and Methods, Applied Social Research Methods Series, Third Edit. London: Applied Social Research Methods Series, 2003. [87] S. F. de C. SFC, “Saldos indicador por mora SFC 082019,” 2019. [88] O. Herrera and L. Becerra, “Diseño general de las etapas de simulación de procesos con énfasis en el análisis de entrada,” Twelfth LACCEI Latin American and Caribbean Conference for Engineering and Technology, p. 10, 2014. [89] S. Aguilar, “Fórmulas para el cálculo de la muestra en investigaciones de salud,” Salud en Tabasco, vol. 11, pp. 333–338, 2005. | |