dc.contributorAmaya-Santander, Luz Karime
dc.contributorSoto-Ortegon, Jose Alirio
dc.contributorTiria-Sandoval, Luis Carlos
dc.creatorFernandez-Suárez, Jaminton Andrey
dc.date.accessioned2023-06-20T16:58:09Z
dc.date.accessioned2023-09-06T19:14:33Z
dc.date.available2023-06-20T16:58:09Z
dc.date.available2023-09-06T19:14:33Z
dc.date.created2023-06-20T16:58:09Z
dc.date.issued2023-05-29
dc.identifierUniversidad de Santander
dc.identifierT 46.23 F276s
dc.identifierRepositorio Digital Universidad de Santander
dc.identifierhttps://repositorio.udes.edu.co
dc.identifierhttps://repositorio.udes.edu.co/handle/001/8689
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/8702141
dc.description.abstractEste informe comprende la descripción del proyecto de grado en la modalidad de práctica empresarial bajo la supervisión de las obras civiles nuevas y/o adecuaciones que se realicen en la corporación, igualmente planear y velar por el correcto cumplimiento de los procedimientos de mantenimiento preventivo, correctivo y rutinario de la planta física del Centro de Convenciones, Ciencia, Tecnología Innovación y Cultura de Bucaramanga-Neomundo. En el desarrollo de la práctica empresarial se llevará a cabo visitas de inspección visual para identificar las afectaciones actuales y futuras en la infraestructura, posterior a esto se realizarán las supervisiones de los diferentes trabajos realizados en el área de mantenimiento de la planta física. Para garantizar los lineamientos de los procesos constructivos, se elaborará APU’S (Análisis de precios unitarios) en tablas de Excel teniendo en cuenta los materiales y rendimiento de mano de obra y equipos según actividades del área de mantenimiento como lo son la obra blanca, mármoles, porcelanatos, red sanitaria y aguas lluvias y red de agua potable y cielo raso. Se dejará como evidencia mediante registro fotográfico el antes durante y después de cada labor, en un formato de Excel, donde se describe un breve procedimiento del trabajo, ubicación exacta, el tiempo y personal que la realizo, con el fin de llevar un control del personal y las actividades realizadas.
dc.description.abstractThis report includes the description of the degree project in the modality of business practice under the supervision of new civil works and/or adaptations that are carried out in the corporation, also plan and ensure the correct compliance with the preventive, corrective maintenance procedures and routine of the physical plant of the Bucaramanga-Neomundo Convention, Science, Technology Innovation and Culture Center. In the development of the business practice, visual inspection visits will be carried out to identify the current and future effects on the infrastructure, after which the supervision of the different works carried out in the maintenance area of the physical plant will be carried out. To guarantee the guidelines of the construction processes, APU'S (Unit Price Analysis) will be prepared in Excel tables taking into account the materials and performance of labor and equipment according to activities in the maintenance area such as white goods, marble, porcelain tiles, sanitary network and rainwater and drinking water network and low ceiling. It will be left as evidence by means of a photographic record of before, during and after each work, in an Excel format, where a brief procedure of the work is described, the exact location, the time and the personnel that carried it out, in order to keep track of the personnel and the activities carried out.
dc.languagespa
dc.publisherUniversidad de Santander
dc.publisherBucaramanga
dc.publisherFacultad de Ingenierías y Tecnologías
dc.publisherBucaramanga, Colombia
dc.publisherTecnología en Supervisión de Obras Civiles
dc.relationSomatec, “¿En qué consiste el mantenimiento de instalaciones físicas y redes técnicas? https://www.somatec.co/mantenimiento-de-obras-civiles/ (Acceso May, 12, 2023).
dc.relationMateriales Jerez, “Para qué sirve un impermeabilizante”. https://www.materialesjerez.com.mx/impermeabilizante/ (Accedido May., 12, 2023).
dc.relationS. Melo, “Como hacer un informe de una visita técnica”, Datascope. https://datascope.io/es/blog/como-hacer-un-informe-de-una-visita-tecnica/ (Accedido May., 12, 2023).
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rightshttp://purl.org/coar/access_right/c_abf2
dc.rightsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.rightsDerechos Reservados - Universidad de Santander, 2023. Al consultar y hacer uso de este recurso, está aceptando las condiciones de uso establecidas por los autores.
dc.titleSupervisión de Mantenimientos y Obras Nuevas Requeridas por la Planta Física de la Corporación Centro de Convenciones, Ciencia, Tecnología Innovación y Cultura de Bucaramanga-Neomundo
dc.typeTrabajo de grado - Pregrado


Este ítem pertenece a la siguiente institución