Diseño de mampostería estructural bajo lineamientos BIM ISO-19650 para la optimización del proceso constructivo en obra
Design of structural masonry under BIM ISO-19650 guidelines for the optimization of the construction process on site
dc.contributor | Fonseca Barrera, Leonardo Augusto | |
dc.creator | López Parada, Jean Carlos | |
dc.date | 2023-08-10T17:31:06Z | |
dc.date | 2023-08-10T17:31:06Z | |
dc.date | 2023-02-03 | |
dc.date.accessioned | 2023-09-06T17:58:44Z | |
dc.date.available | 2023-09-06T17:58:44Z | |
dc.identifier | http://hdl.handle.net/10654/45014 | |
dc.identifier | instname:Universidad Militar Nueva Granada | |
dc.identifier | reponame:Repositorio Institucional Universidad Militar Nueva Granada | |
dc.identifier | repourl:https://repository.unimilitar.edu.co | |
dc.identifier.uri | https://repositorioslatinoamericanos.uchile.cl/handle/2250/8693696 | |
dc.description | En el desarrollo de BIM a nivel mundial como plataforma colaborativa se ha encontrado el tipo de tecnología que ha logrado reunir todas las áreas de diseño, programación, costos y presupuestos que hacen parte de los proyectos de construcción, un aporte de diferentes áreas de investigación a nivel mundial está desarrollando la forma de poder generar de manera colaborativa en tiempo real el compartir información y así lograr una eficacia en los tiempos de ejecución. La línea de investigación que se plantea desarrollar es aplicar los avances tecnológicos actuales de nivel mundial, en poder desarrollar el entorno de especialidades el cual es aplicado actualmente en la fase colaborativa de diseño, llegar a un desarrollo por medio del código abierto IFC (Industry Foundation Classes), con el cual se puedan generar la transferencia de modelado del programa de diseño estructural, al programa de diseño en 3D aplicado en obra, con esto al aplicar el desarrollo BIM en obra se puedan concluir en la fase de construcción la información en línea necesaria para construir y solucionar múltiples actividades que en la actualidad se puedan ver como procesos de consulta y coordinación de los diseñadores. Al final se buscó concluir una operatividad de las especialidades en el que la ejecución de actividades físicas en obra aporte soluciones de efectividad en el avance diario, que la supervisión técnica controle fácilmente con la interpretación visual del elemento en 3D y que las consultas de planos se manejen de forma digital por todos los profesionales y maestros en sitio con su medio de comunicación tecnológico. | |
dc.description | TABLA DE CONTENIDO TABLA DE ILUSTRACIONES RESUMEN ABSTRACT 1 INTRODUCCIÓN 1.1 Planteamiento del problema 1 1.2 Justificación 4 1.3 Objetivos 6 2 ANTECEDENTES Y ESTADO DEL ARTE 8 2.1 Antecedentes 9 2.2 Estado del arte 13 3 MARCO DE REFERENCIA 19 3.1 Marco conceptual 19 3.2 Marco teórico 22 4 METODOLOGÍA/DESARROLLO/MATERIALES Y MÉTODOS/DISEÑO EXPERIMENTAL 24 4.1 Desarrollo del objetivo No. 1 25 4.1.1 Proceso modelado diseño arquitectónico 26 4.1.2 Modelado del proyecto en formato IFC 31 4.1.3 Diseño estructural 37 4.1.4 Diseño eléctrico, hidrosanitario y gas 39 4.2 Desarrollo del objetivo No. 2 41 4.2.1 Creación de la estructura por medio del formato IFC 42 4.3 Desarrollo del objetivo No. 3 47 4.3.1 Creación de las interferencias entre especialidades 48 5 CONCLUSIONES 51 5.1 Conclusión desarrollo primera fase 51 5.2 Conclusión desarrollo segunda fase 52 5.3 Conclusión tercera fase 53 6 RECOMENDACIONES 54 7 REFERENCIAS 55 | |
dc.description | In the development of BIM worldwide as a collaborative platform has been found the type of technology that has managed to bring together all areas of design, scheduling, costs and budgets that are part of construction projects, a contribution of different areas of research worldwide is developing the way to collaboratively generate real-time information sharing and thus achieve efficiency in execution times. The line of research to be developed is to apply current technological advances worldwide, in order to develop the environment of specialties which is currently applied in the collaborative design phase, to reach a development through open source IFC (Industry Foundation Classes), with which the transfer of modeling from the structural design program to the 3D design program applied on site can be generated, with this, when applying the BIM development on site, the online information necessary to build and solve multiple activities that currently can be seen as consultation and coordination processes of the designers can be concluded in the construction phase. In the end, we sought to conclude an operability of the specialties in which the execution of physical activities on site provides effective solutions in the daily progress, that the technical supervision easily controls with the visual interpretation of the 3D element and that the consultations of plans are handled digitally by all professionals and teachers on site with their technological means of communication. | |
dc.description | Maestría | |
dc.format | applicaction/pdf | |
dc.format | application/pdf | |
dc.language | spa | |
dc.publisher | Maestría en Ingeniería Civil | |
dc.publisher | Facultad de Ingeniería | |
dc.publisher | Universidad Militar Nueva Granada | |
dc.relation | Guía BIM para Propietarios y Gestors de Activos. Issuu. https://issuu.com/buildingsmart_spain/docs/2020_guia_bim_para_propietarios_y_gestor es_de_fm | |
dc.relation | Alattas, A., Kalogianni, E., Alzahrani, T., Zlatanova, S., & van Oosterom, P. (2021). Mapping private, common, and exclusive common spaces in buildings from BIM/IFC to LADM. A case study from Saudi Arabia. Land Use Policy, 104. https://doi.org/10.1016/j.landusepol.2021.105355 | |
dc.relation | Aplicando los requerimientos del Estándar BIM para Proyectos Públicos. (2019, junio 18). Planbim. https://planbim.cl/aplicando-los-requerimientos-del-estandar-bim-para-proyectos- publicos-sebastian-manriquez-paulina-godoy-carolina-briones/ | |
dc.relation | BIM KIT guías para la adopción BIM en las organizaciones | Camacol. (s. f.). https://camacol.co/documentos-bim-forum-colombia | |
dc.relation | BIMForum—LOD. (s. f.). https://bimforum.org/lod/ | |
dc.relation | Documentos de interés. (s. f.). BuildingSMART Spanish Chapter. http://www.buildingsmart.es/recursos/ | |
dc.relation | Garber, R. (2014). BIM design: Realising the creative potential of building information modelling. Chichester, England : Wiley, 2014. https://ezproxy.umng.edu.co/login?url=http://search.ebscohost.com/login.aspx?direct=tr ue&db=cat04962a&AN=umn.ebr10960599&lang=es&site=eds-live | |
dc.relation | Guías uBIM. (s. f.). BuildingSMART Spanish Chapter. http://www.buildingsmart.es/bim/guías- ubim/ | |
dc.relation | Introducción EN ISO 19650. (s. f.). BuildingSMART Spanish Chapter. http://www.buildingsmart.es/recursos/en-iso-19650/ | |
dc.relation | Manualifc_revit_esp2018.pdf. (s. f.). https://oliebana.files.wordpress.com/2018/10/manualifc_revit_esp2018.pdf | |
dc.relation | Número 20-01. (s. f.). BuildingSMART Spanish Chapter. http://www.buildingsmart.es/journal- sjbim/historial/ | |
dc.relation | Porras-Díaz, H., Sánchez-Rivera, O. G., Guerra, J. A. G., Jaimez-Plata, N. A., & Castañeda-Parra, K. M. (2015). Tecnologías «Building Information Modeling» en la elaboración de presupuestos de construcción de estructuras en concreto reforzado. Entramado, 11(1), 230-249. | |
dc.rights | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights | http://purl.org/coar/access_right/c_abf2 | |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | |
dc.rights | Acceso abierto | |
dc.subject | INDUSTRIA DE LA CONSTRUCCION | |
dc.subject | INDUSTRIA DE LA CONSTRUCCION - MAMPOSTERIA | |
dc.subject | Masonry | |
dc.subject | BIM | |
dc.subject | Design | |
dc.subject | IFC | |
dc.subject | Mampostería | |
dc.subject | BIM | |
dc.subject | Diseño | |
dc.subject | IFC | |
dc.title | Diseño de mampostería estructural bajo lineamientos BIM ISO-19650 para la optimización del proceso constructivo en obra | |
dc.title | Design of structural masonry under BIM ISO-19650 guidelines for the optimization of the construction process on site | |
dc.type | Tesis/Trabajo de grado - Monografía - Maestría | |
dc.type | info:eu-repo/semantics/masterThesis | |
dc.type | http://purl.org/coar/resource_type/c_bdcc | |
dc.type | info:eu-repo/semantics/acceptedVersion | |
dc.coverage | Calle 100 |