Interacción Lean-BIM para el diseño de metodología de gestión de proyectos de construcción en etapa de planificación y ejecucion
Lean-BIM interaction for the design of construction project management methodology in the planning and execution phase
dc.contributor | Rincón Castro, David Alejandro | |
dc.creator | Borda Zambrano, Miguel Angel | |
dc.date | 2023-06-06T20:54:07Z | |
dc.date | 2023-06-06T20:54:07Z | |
dc.date | 2022-11-05 | |
dc.date.accessioned | 2023-09-06T17:55:57Z | |
dc.date.available | 2023-09-06T17:55:57Z | |
dc.identifier | http://hdl.handle.net/10654/44377 | |
dc.identifier | instname:Universidad Militar Nueva Granada | |
dc.identifier | reponame:Repositorio Institucional Universidad Militar Nueva Granada | |
dc.identifier | repourl:https://repository.unimilitar.edu.co | |
dc.identifier.uri | https://repositorioslatinoamericanos.uchile.cl/handle/2250/8693502 | |
dc.description | El presente artículo, pretende inicialmente mostrar la problemática en materia de productividad, rendimientos, sobrecostos en el sector construcción a nivel nacional con el fin de enmarcar en soluciones que puedan mejorar este aspecto y garantizar la excelencia en calidad, tiempo y costos en el sector de la construcción mediante la ejecución de cuatro fases en la presente investigación que constara de una revisión literaria para enmarcar la importancia de la metodología BIM y Lean, un diagnóstico mediante una encuesta de evaluación, establecer la relación entre Lean y BIM y establecer un paso a paso para finalmente concretar la interacción de Last Planner como herramienta de Lean Construction y BIM como herramienta de modelado para contribuir a la mejora de procesos de planificación y ejecución disminuyendo las interferencias, reprocesos, sobrecostos y retrasos. | |
dc.description | This article initially intends to show the problems in terms of productivity, yields, cost overruns in the construction sector at a national level in order to frame ourselves in solutions that can improve this aspect and guarantee excellence in quality, time and costs in the construction sector. the construction through the execution of four phases in the present investigation that will consist of a literary review to frame the importance of the BIM and Lean methodology, a diagnosis through an evaluation survey, establish the relationship between Lean and BIM and establish a step by step to finally specify the interaction of Last Planner as a Lean Construction tool and BIM as a modeling tool to contribute to the improvement of planning and execution processes, reducing interferences, reprocessing, cost overruns and delays. | |
dc.description | Especialización | |
dc.format | applicaction/pdf | |
dc.format | application/pdf | |
dc.language | spa | |
dc.publisher | Especialización en Gerencia Integral de Proyectos | |
dc.publisher | Facultad de Ingeniería | |
dc.publisher | Universidad Militar Nueva Granada | |
dc.relation | AllCounted. (2022). AllCounted. 2022 https://www.allcounted.com/about | |
dc.relation | Aranda, D. (2020). Implementación de Last Planner en Obra. https://www.youtube.com/watch?v=RBNzNByEdms&ab_channel=GrupoICGUCV | |
dc.relation | Autodesk. (2022). Revit: software BIM para diseñadores, constructores y emprendedores. 2022 https://www.autodesk.es/products/revit/overview?term=1-YEAR&tab=subscription | |
dc.relation | Banco de la república de Colombia. (2022). Productor Interno Bruto (PIB). 2022 https://www.banrep.gov.co/es/glosario/producto-interno-bruto-pib | |
dc.relation | BIMPSAS. (2020). Coordinación BIM. 2020 https://www.bimpsas.com/coordinacion-bim/#:~:text=La%20coordinaci%C3%B3n%20BIM%20es%20uno%20de%20los%20usos,los%20dise%C3%B1os%20arquitecturonicos%2C%20estructurales%2C%20el%C3%A9ctricos%2C%20mec%C3%A1nico%20e%20hidrosanitario. | |
dc.relation | Burgos Mateo. (2015). Análisis de las causas del incumplimiento de programación en las obras civiles. | |
dc.relation | CAMACOL, & Cámara Colombiana de la Construcción. (2018). INFORME DE PRODUCTIVIDAD | |
dc.relation | Consultoría, S. R. L. (2022). DC Consultoría S.R.L. https://www.dcconsultoria.net/que-hacemos/ | |
dc.relation | DANE. (2022). Indicadores Económicos Alrededor de la Construcción (IEAC). (). Bogotá: https://www.dane.gov.co/files/investigaciones/boletines/pib_const/Bol_ieac_Itrim22.pdf | |
dc.relation | Eldeep, A. M., Farag, M. A. M., & Abd El-hafez, L. M. (2022a). Using BIM as a lean management tool in construction processes – A case study. Ain Shams Engineering Journal, 13(2), N.PAG. | |
dc.relation | Eldeep, A. M., Farag, M. A. M., & Abd El-hafez, L. M. (2022b). Using BIM as a lean management tool in construction processes – A case study. Ain Shams Engineering Journal, 13(2), N.PAG. | |
dc.relation | Fosse, R. and Ballard, G. (2016). Lean Design Management with the Last Planner System”., 2-10. https://leanconstruction.org.uk/wp-content/uploads/2018/10/Fosse-and-Ballard-2016-Lean-Design-Management-in-Practice-With-the-Last-Planner-System.pdf Heigermoser, D., García de Soto, B., Abbott, E. L. S., & Chua, D. K. H. (2019a). | |
dc.relation | BIM-based Last Planner System tool for improving construction project management. Automation in Construction, 104, 246. | |
dc.relation | Hoyos Restrepo, M. F., & Botero, L. F. (2021). Implementación del sistema del último planificador en el sector constructor colombiano: Caso de estudio: Implementation of the last planner system in colombian construction sector: A case study. Ingeniare: Revista Chilena De Ingeniería, 29(. 4), 601. | |
dc.relation | IONOS. (2019). DIGITAL GUIDE IONOS . https://www.ionos.es/digitalguide/paginas-web/desarrollo-web/que-es-kanban/ | |
dc.relation | Medina Gerardo, J. (2021). LinkedIn . https://www.linkedin.com/pulse/el-concepto-de-desperdicio-muda-en-lean-construction-y-gerardo-medina | |
dc.relation | PMI, P. M. I. (2017). : La guía de los fundamentos para la dirección de proyectos (Guía del PMBOK) / Project Management Institute (6th ed.). Project Management Institute, Inc. | |
dc.relation | Schimanski, C. P., Pradhan, N. L., Chaltsev, D., Pasetti Monizza, G., & Matt, D. T. (2021). Integrating BIM with Lean Construction approach: Functional requirements and production management software. Automation in Construction, 132 SlideUpLift. (2022). Rag Status. https://slideuplift.com/powerpoint-templates/rag-status-03/ | |
dc.relation | Torres, L. (2020). Webinar - Efi-Ciencia Colaborativa es “Last Planner System , lo que asegura el éxito en BIM. https://www.youtube.com/watch?v=4WvzHJt6Y2g&ab_channel=CONSULTORIABIMCOMGRAP | |
dc.relation | Virgolini Diego. (2019). VISUAL MANAGEMENT PARA POTENCIAR EQUIPOS. https://www.linkedin.com/pulse/radiadores-de-informaci%C3%B3n-diego-virgolini/?originalSubdomain=es | |
dc.relation | Yate Humberto, & Santos Kent. (2021). Plan metodológico para la implementación BIM en proyectos de infraestructura de seguridad ciudadana desarrollados por la secretaria de gobierno en el municipio de Soacha Cundinamarca. | |
dc.rights | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights | http://purl.org/coar/access_right/c_abf2 | |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | |
dc.rights | Acceso abierto | |
dc.subject | ADMINISTRACION DE PROYECTOS | |
dc.subject | INDUSTRIA DE LA CONSTRUCCION | |
dc.subject | PLANIFICACION ESTRATEGICA | |
dc.subject | Lean | |
dc.subject | Construction | |
dc.subject | BIM | |
dc.subject | Autocad | |
dc.subject | Last | |
dc.subject | Planner | |
dc.subject | System | |
dc.subject | Pull | |
dc.subject | Plan | |
dc.subject | weekly | |
dc.subject | Look | |
dc.subject | Ahead | |
dc.subject | Stakeholders | |
dc.subject | Lean Construction Institute. (2022). Lean Construction | |
dc.subject | Lean | |
dc.subject | Construction | |
dc.subject | BIM | |
dc.subject | Ultimo | |
dc.subject | Planificador | |
dc.subject | Planificación | |
dc.subject | Ejecución | |
dc.subject | Library. (2022). La revisión de literatura. 2022 https://1library.co/article/la-revisi%C3%B3n-de-literatura-proyecto-de-investigaci%C3%B3n.qvj669lq | |
dc.title | Interacción Lean-BIM para el diseño de metodología de gestión de proyectos de construcción en etapa de planificación y ejecucion | |
dc.title | Lean-BIM interaction for the design of construction project management methodology in the planning and execution phase | |
dc.type | Tesis/Trabajo de grado - Monografía - Especialización | |
dc.type | info:eu-repo/semantics/bachelorThesis | |
dc.type | http://purl.org/coar/resource_type/c_7a1f | |
dc.type | info:eu-repo/semantics/acceptedVersion | |
dc.coverage | Calle 100 |