dc.contributorSônia Denise Ferreira Rocha
dc.contributorhttp://lattes.cnpq.br/4453672540711904
dc.contributorPaulo Roberto de Magalhães Viana
dc.contributorElbert Muller Nigri
dc.creatorMateus Henrique Vieira Torres
dc.date.accessioned2023-04-19T18:52:48Z
dc.date.accessioned2023-06-16T17:33:37Z
dc.date.available2023-04-19T18:52:48Z
dc.date.available2023-06-16T17:33:37Z
dc.date.created2023-04-19T18:52:48Z
dc.date.issued2012-07-17
dc.identifierhttp://hdl.handle.net/1843/52271
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/6686171
dc.description.abstractThe study compared the recovery of the mine tailings Factory, has as main objective to analyze the feasibility of recovery of the mine tailings Factory, by testing a sample in relation to the content of Fe The specific objectives were to present the brief historical context related to mining in Brazil, demonstrating the stages of production of ore, mining tailings define, analyze on the disposal of mining tailings, and demonstrate the importance of the tailings dam to reduce environmental impacts. The research was characterized as being exploratory quantitative, triggering a case study, based on analysis by sampling the Fe content in the waste of Mine Plant. Regarding the theoretical framework, we used references, articles and theses that seeking support of the proposed study, it was a reflection in the light of various scholars who hold forth on the proposed topic. Regarding the lease of the plant near the plant now, the advantages presented reported the use of existing spacers; greater flexibility for water balance, ease of operation. However, the disadvantages were highlighted interference with the current operation; project without synergy with the dam project, and interference in the courtyard of current production. Thus, it was found that the disadvantages are significant, which leads to further studies on the feasibility of the recovery of the residue in relation to location of the plant close to the current plan. We also analyzed strategies concerning the lease of the plant near the Dam III fork, where the benefits were presented as the synergy with the recovery project dams, low interference with the current operation, and synergy with the mining of the dams. The disadvantages presented at that location were considered lower than the first analysis of the location of the plant, with only the difficulty of water balance, and logistical difficulties for operation and maintenance. In this sense, it was concluded that the viability of recovery of the mine tailings Factory presents more viable over the simulations, routes and tests, if the lease of the plant is present near the Dam III fork, due to its advantages attractive in relation to the disadvantages which can be performed strategies for their viability remedying the problems presented.
dc.publisherUniversidade Federal de Minas Gerais
dc.publisherBrasil
dc.publisherENG - DEPARTAMENTO DE ENGENHARIA METALÚRGICA
dc.publisherCurso de Especialização em Engenharia de Recursos Minerais
dc.publisherUFMG
dc.rightsAcesso Aberto
dc.subjectRejeito
dc.subjectTeor de Fe
dc.subjectBarragem
dc.subjectRecuperação
dc.subjectMineração
dc.titleRecuperação do rejeito da mina da fábrica
dc.typeMonografia (especialização)


Este ítem pertenece a la siguiente institución