dc.contributor | Domínguez Prada, Mario Andres | |
dc.creator | Corzo Marin, Marleny | |
dc.creator | Bello Duque, Luis Alejandro | |
dc.date.accessioned | 2022-10-26T19:25:34Z | |
dc.date.accessioned | 2023-06-12T18:05:51Z | |
dc.date.available | 2022-10-26T19:25:34Z | |
dc.date.available | 2023-06-12T18:05:51Z | |
dc.date.created | 2022-10-26T19:25:34Z | |
dc.date.issued | 2022-10-26 | |
dc.identifier | Corzo Marín, M. Bello Duque, L. A.(2022). Implementación de la metodología BIM (Bulding Information Modeling) en la construcción de un proyecto de vivienda en la constructora Prabyc Ingenieros. [Tesis de maestría]. Universidad Santo Tomás. Bucaramanga, Colombia | |
dc.identifier | http://hdl.handle.net/11634/47787 | |
dc.identifier | reponame:Repositorio Institucional Universidad Santo Tomás | |
dc.identifier | instname:Universidad Santo Tomás | |
dc.identifier | repourl:https://repository.usta.edu.co | |
dc.identifier.uri | https://repositorioslatinoamericanos.uchile.cl/handle/2250/6659676 | |
dc.description.abstract | The present work aims to address the problem evidenced in the company Prabyc Ingenieros when executing its construction projects, since these are carried out without a definitive budget due to the lack of designs or, failing that, due to the lack of coordination that allows having the plans and specifications of the project before starting any activity, generating reprocesses and unestimated cost overruns that affect the budget and the usefulness of the project. For the business, the most important thing is customer satisfaction with a quality product that seeks to meet their needs with efficient processes at low cost and in the estimated times, in this sense, the general objective is to carry out the implementation of the BIM methodology in a project of the Prabyc engineers construction company in order to seek good planning that allows projects to be managed efficiently through technological tools that help optimize administrative, financial and operational processes, generating savings in time, costs and human resources; As a method, the study of a housing project was proposed, which allowed us to carry out the implementation of the methodology, demonstrating that with the use of efficient technological tools, the execution processes on site and in the planning of technical designs can be positively impacted. | |
dc.language | spa | |
dc.publisher | Universidad Santo Tomás | |
dc.publisher | Maestría Dirección y Gestión de Proyectos | |
dc.publisher | Facultad de Ingeniería de Telecomunicaciones | |
dc.relation | Consejo Superior de Colegios Arquitectos de España. (s.f). Todas las claves para conocer BIM en 8 puntos. https://www.cscae.com/index.php/es/conocecscae/area-tecnica/bim/documentos-y-actualidad-bim/225-bim-documentos/4442-todas-las-claves-para-conocer-bim-en-8-puntos. | |
dc.relation | Construction Industry Council. (2015). CIC Building Information Modelling Standards-Guia bim hong kong. https://www.cic.hk/cic_data/pdf/about_cic/news_and_update/BIM/Eng/CIC%20BI M%20Standards_FINAL_ENG_v1.pdf | |
dc.relation | Alonso. J. (2015). Nivel de desarrollo LOD. Definiciones, innovaciones y adaptación a España. Spanish Journal of Building Information Modelinf, 15(1), 40-56 | |
dc.relation | Real Academia Española –RAE. (2014). Diccionario de la lengua española. (23 ed). Madrid: ASALE. http://dle.rae.es/?id=RpXSRZJ. | |
dc.relation | Revista Building Smart Jam. (2015, Agosto 18). LOD, https://www.buildingsmart.es/2015/05/18/disponible-el-nuevo-n%C3%BAmerodel-journal-sjbim-1501/LOD | |
dc.rights | http://creativecommons.org/licenses/by-nc-nd/2.5/co/ | |
dc.rights | Abierto (Texto Completo) | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights | http://purl.org/coar/access_right/c_abf2 | |
dc.rights | Atribución-NoComercial-SinDerivadas 2.5 Colombia | |
dc.title | Implementación de la metodologia BIM (Building Information Modeling ) en un proyecto de vivienda en la constructora Prabyc Ingenieros. | |