dc.contributorCana Paullo, Hugo
dc.creatorBellota Gonzales, Luiggi Wilmer
dc.date.accessioned2023-03-28T14:42:30Z
dc.date.accessioned2023-05-30T22:09:15Z
dc.date.available2023-03-28T14:42:30Z
dc.date.available2023-05-30T22:09:15Z
dc.date.created2023-03-28T14:42:30Z
dc.date.issued2022-12-21
dc.identifierhttps://hdl.handle.net/20.500.12557/5260
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/6465157
dc.description.abstractLa presente investigación “Análisis de la Influencia en la detección de interferencias entre planos estructurales e instalaciones sanitarias, utilizando la metodología tradicional CAD2D y la metodología BIM en el diseño de dos centros de salud elaborados por el G.R.C”, tuvo como objetivo analizar de manera comparativa los rendimientos en la aplicación de ambas metodologías. Realizando la medición de manera indirecta para los datos de la metodología tradicional CAD2D y de manera directa para la metodología de trabajo BIM, ambos en la etapa diseño de proyectos. Asimismo, para la compatibilización de metrados. Los casos de estudios fueron los proyectos de edificación de categoría esencial tipo centro de salud “Mejoramiento de los servicios de salud del centro de salud Ttio, distrito de Wanchaq, provincia de Cusco, región – Cusco” y “Mejoramiento de los Servicios de Salud en el centro de Salud de Pomacanchi, Distrito de Pomacanchi, Provincia de Acomayo, Región Cusco”, ambos proyectos elaborados por la Sub Gerencia de Estudios de Inversión del Gobierno Regional de Infraestructura, Gobierno Regional del Cusco. Esta investigación se llevó a cabo a partir de un marco teórico donde se analizó antecedentes que se asemejan al tema, desde una perspectiva nacional e internacional. También se desarrolló los conceptos básicos y fundamentales que conciernen a la implementación de la metodología de trabajo BIM, sus antecedentes donde fueron ya implementados y la retroalimentación que estos generan para futuros proyectos. La metodología abarcada en esta investigación tiene un enfoque cuantitativo, con un nivel descriptivo – correlacional, empleando un método aplicado cuyo diseño metodológico es no experimental. De los resultados se concluye que la Influencia en la detección de interferencias e incompatibilidad de metrados entre planos estructurales e instalaciones sanitarias, utilizando la metodología BIM es más eficiente frente a la metodología tradicional CAD2D en la etapa de diseño.
dc.description.abstractThe present investigation "Analysis of the Influence in the detection of interferences between structural plans and sanitary installations, using the traditional CAD2D methodology and the BIM methodology in the design of two health centers elaborated by the G.R.C", had as objective to analyze in a comparative way yields in the application of both methodologies. Performing the measurement indirectly for the data of the traditional CAD2D methodology and directly for the BIM work methodology, both in the project design stage. Likewise, for the compatibility of metrics. The case studies were the building projects of essential category type health center "Improvement of health services of the Ttio health center, district of Wanchaq, province of Cusco, region - Cusco" and "Improvement of Health Services in the Pomacanchi Health Center, Pomacanchi District, Acomayo Province, Cusco Region", both projects prepared by the Sub Management of Investment Studies of the Regional Government of Infrastructure, Regional Government of Cusco. The investigation was carried out from a theoretical framework where antecedents that resemble the subject were analyzed, from a national and international perspective. The basic and fundamental concepts that concern the implementation of the BIM work methodology were also developed, their background where they were already implemented and the feedback they generate for future projects. The methodology covered in this research has a quantitative approach, with a descriptive - correlational, using an applied method whose methodological design is non-experimental. From the results it is concluded that the influence on the detection of interferences and incompatibility of measurements between structural plans and sanitary facilities, using the BIM methodology is more efficient compared to the methodology traditional CAD2D in the design stage.
dc.languagespa
dc.publisherUniversidad Andina del Cusco
dc.publisherPE
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectImplementación
dc.subjectInterferencias
dc.subjectMetrados
dc.subjectCompatibilización
dc.titleAnálisis de la influencia en la detección de interferencias y compatibilidad de metrados entre planos estructurales e instalaciones sanitarias, utilizando la metodología tradicional CAD2D y la metodología BIM en el diseño de dos centros de salud elaborados por el Gobierno Regional del Cusco, 2021
dc.typeinfo:eu-repo/semantics/bachelorThesis


Este ítem pertenece a la siguiente institución