dc.contributorCalderón Prieto, Abdón
dc.creatorTejada Arreaga, José Fernando
dc.date.accessioned2021-07-09T14:41:26Z
dc.date.accessioned2023-03-09T16:25:44Z
dc.date.available2021-07-09T14:41:26Z
dc.date.available2023-03-09T16:25:44Z
dc.date.created2021-07-09T14:41:26Z
dc.date.issued2015-08-13
dc.identifierhttp://repositorio.ug.edu.ec/handle/redug/54050
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/6083893
dc.description.abstractEste estudio tiene como objetivo, mejorar la calidad de fabricación de las varillas corrugadas termotratadas de la empresa Andec S.A, con el fin de mejorar sus propiedades físicas y mecánicas, aumentar su producción, eliminar las paradas no programadas y disminuir los costos que estaban generando poca utilidad a la empresa por la compra de materia prima importada. Para el análisis del problema se utiliza las herramientas de mejora entre las cuales tenemos: Lluvia de ideas, Toma de recolección de datos, Gráfica de barras, Diagrama Causa-Efecto, Diagrama de Pareto, análisis Químico y análisis metalográfico de la estructura interna de la varilla. Sé analizó los resultados obtenidos para dar un diagnostico donde se hizo la propuesta de ajustar los parámetros del proceso y hacer un control de la temperatura de salida del Tempcore. El impacto económico causado por los problemas de calidad por el defecto de fisura en las varillas corrugadas termotratadases de $10’952.541,71 por material no conforme, paradas no programadas, evacuación de materia prima y compra de material importado. Se planteó una Propuesta de mejora, realizando una inversión de $5.920,58 con un B/C de 1997 y un ahorro de $ 11’823.694,50 que nos indica que es la mejor elección, recuperando la inversión en el primer mes, inclusive con ganancia.
dc.description.abstractThis study aims to improve the quality of manufacture of rods corrugated heat-treated of enterprise Andec S.A. in order to improve its physical and mechanical properties, increase their production, eliminate the unplanned shutdowns, and lower costs that were making little use to the company on the purchase of imported raw. For the analysis of the problem, we use the improvement tools among which we have: Brainstorming, taking data collection, Bar Graph, Diagram Cause and Effect, Pareto Diagram, Chemical analysis and Metallographic analysis of the internal structure of the rod. The results obtained were analyzed to give a diagnosis where is made the proposal to adjust the parameters of the process and make the Tempcore outlet temperature control. The economicimpact caused by quality problems by defect of fissure in the corrugated rods heat-treated is $10'952.541,71 by non-compliant material, unplanned shutdowns, disposal of raw materials and purchase of imported material. They raised a proposal for improvement, making investments of $5.920,58 which a B/C of 1997 and saving of $11' 823.694,50 indicates that it is the best choice, recovering the investment in the first month, even with profit.
dc.languagespa
dc.publisherUniversidad de Guayaquil. Facultad de Ingeniería Industrial. Carrera de Ingeniería Industrial.
dc.relation;BINGI04496
dc.rightsopenAccess
dc.subjectSISTEMAS PRODUCTIVOS
dc.subjectELIMINAR PAROS NO PROGRAMADOS
dc.subjectVARILLAS CORRUGADAS
dc.subjectTEMPCORE
dc.titleAnálisis y mejora de los factores que afectan la calidad de las varillas corrugadas termotratadas en la Empresa Andec S.A.
dc.typeThesis


Este ítem pertenece a la siguiente institución