dc.contributor | Ugalde Vicuña, José William | |
dc.creator | Sánchez Vera, Wellington Walter | |
dc.date.accessioned | 2019-10-28T16:29:52Z | |
dc.date.accessioned | 2023-03-09T15:25:45Z | |
dc.date.available | 2019-10-28T16:29:52Z | |
dc.date.available | 2023-03-09T15:25:45Z | |
dc.date.created | 2019-10-28T16:29:52Z | |
dc.date.issued | 2019-09-03 | |
dc.identifier | http://repositorio.ug.edu.ec/handle/redug/44984 | |
dc.identifier.uri | https://repositorioslatinoamericanos.uchile.cl/handle/2250/6074909 | |
dc.description.abstract | La investigación se realizó en el taller de tubos de escapes Blazer, que tiene como actividad principal fabricar tubos de escapes e instalar catalizadores para automóviles. El objetivo de este plan es eliminar o reducir los riesgos de accidentes que están ocasionando ausentismo en la empresa. El análisis se inició con encuestas, se aplicó una matriz de triple criterio para evaluar los factores deriesgos que ocasionan accidentes, para posteriormente priorizarlos por su mayor grado de peligrosidad según los lineamientos del método Fine. Obteniendo como resultado: riesgos moderados (111), riesgos importantes (123) y riesgos intolerables (74). De materializarse los riesgos provocarán un gasto de $ 9040 que va a ser enfrentado mediante: capacitaciones, plan de señalética, entrega de equipos de protección personal. Estas propuestas mejoraranel ambiente laboral y reducirá el ausentismo por accidentes detrabajo. | |
dc.description.abstract | The research was carried out in the “Blazer”exhaust pipe workshop, whose main activity is to manufacture exhaust pipes and install catalysts for automobiles. The objective of this plan is to eliminate or reduce the risks of accidents that are causing absenteeism in the company. The analysis began with surveys, a triple criterion matrix was applied to evaluate the risk factors that cause accidents, to later prioritize them by their greater degree of danger according to the guidelines of the Fine method. Obtaining as a result: moderate risks (111), important risks (123) and intolerable risks (74). If the risksarematerialized, they will cause an expense of $ 9040 that will be faced through: training, signage plan, delivery of personal protective equipment. These proposals will improve the work environment and reduce absenteeism due to accidents at work. | |
dc.language | spa | |
dc.publisher | Universidad de Guayaquil. Facultad de Ingeniería Industrial. Carrera de Ingeniería Industrial. | |
dc.relation | ;BINGI05363 | |
dc.rights | openAccess | |
dc.subject | SISTEMAS INTEGRADOS DE GESTIÓN | |
dc.subject | TUBOS DE ESCAPE | |
dc.subject | FACTORES DE RIESGO | |
dc.subject | AUSENTISMO LABORAL | |
dc.title | Plan de seguridad y salud ocupacional para taller de tubos de escape Blazer. | |
dc.type | Thesis | |