dc.contributor | Vela Albuja, Luis Alfonso | |
dc.creator | Morán Morales, Brayam Andrés | |
dc.date.accessioned | 2018-12-06T16:12:55Z | |
dc.date.accessioned | 2023-03-09T14:48:41Z | |
dc.date.available | 2018-12-06T16:12:55Z | |
dc.date.available | 2023-03-09T14:48:41Z | |
dc.date.created | 2018-12-06T16:12:55Z | |
dc.date.issued | 2018-09-11 | |
dc.identifier | http://repositorio.ug.edu.ec/handle/redug/36591 | |
dc.identifier.uri | https://repositorioslatinoamericanos.uchile.cl/handle/2250/6066676 | |
dc.description.abstract | Determinar el riesgo de trabajos en altura aplicando el método fine en área de almacenamiento de prefabricados de hormigón en la empresa Dermigon S.A. Se eligió esta área por ser de mayor peligrosidad ya que realizan trabajos de izajes de postes, se empezó con la elaboración de una matriz de triple criterio para identificar el riesgo de mayor incidencia en este caso es el mecánico con un 32%. Una vez identificado los riesgos intolerables, trabajos en altura que superan el límite de 1.8 m y los golpes por izado de caída de objetos. Se aplicó el método Fine en donde se obtuvo un Grado de Peligrosidad y Repercusión alto lo que indica que la intervención es a corto plazo. La propuesta para mitigar el impacto de los riesgos mecánicos es la compra de una plataforma elevadora eléctrica y la aplicación de zunchos metálicos para el amarre de postes en el área de almacenamiento temporal. | |
dc.description.abstract | Determine the risk of work at height by applying the Fine method in the prefabricated storage area in the company Dermigon S.A. This area was chosen because it takes major risks since it carries out the lifting of post, it started with the elaboration of a triple criterion matrix to identify the risk of higher incidence, in this case it is the mechanic, with 32%. Once the intolerable risks were identified, work at height that exceeds the limit of 1. 8 m, and the hits caused by hoisting objects falling, the Fine method was applied where a degree of danger and high Impact was obtained, which indicates that the intervention is short-term. The proposal to mitigate the impact of mechanical risks is the purchase of an electric lifting platform and the application of metal straps for the mooring of poles in the temporary storage area. | |
dc.language | spa | |
dc.publisher | Universidad de Guayaquil. Facultad de Ingeniería Industrial. Carrera de Ingeniería Industrial. | |
dc.relation | ;BINGI05174 | |
dc.rights | openAccess | |
dc.subject | SISTEMAS INTEGRADOS DE GESTIÓN | |
dc.subject | PREFABRICADOS DE HORMIGÓN | |
dc.subject | FACTORES DE RIESGOS | |
dc.subject | RIESGOS LABORALES Y MECÁNICOS | |
dc.title | Determinación de riesgo de trabajo en altura aplicando el método Fine en el área de almacenamiento de prefabricados de hormigón. | |
dc.type | Thesis | |