dc.contributorUniversidade Estadual Paulista (Unesp)
dc.contributorUniv Castilla La Mancha
dc.date.accessioned2020-12-10T19:33:03Z
dc.date.accessioned2022-12-19T20:12:40Z
dc.date.available2020-12-10T19:33:03Z
dc.date.available2022-12-19T20:12:40Z
dc.date.created2020-12-10T19:33:03Z
dc.date.issued2013-01-01
dc.identifier2013 Ieee Grenoble Powertech (powertech). New York: Ieee, 6 p., 2013.
dc.identifierhttp://hdl.handle.net/11449/196089
dc.identifierWOS:000387091900037
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/5376726
dc.description.abstractThis paper presents a multiobjective model for the multistage planning problem of a distribution system. The problem is formulated as a multiobjective mixed integer nonlinear programming model. The actions deemed in this model for each period of the planning horizon are: increase in the capacity of existing substations (or construction of new ones), exchange of cables in existing lines (and construction of new feeders), reconfiguration of the network, allocation of sectionalizing switches and construction of tie lines. Taking into account these actions, the objective functions used in this model are the investment and operational costs as well as the system's reliability under contingencies using an n-1 criterion. Reliability is calculated by means of the non-supplied energy. To solve the proposed multiobjective model a multiobjective tabu search method is used. Numerical results are presented for a 54-bus system.
dc.languageeng
dc.publisherIeee
dc.relation2013 Ieee Grenoble Powertech (powertech)
dc.sourceWeb of Science
dc.subjectDistribution system planning
dc.subjectmultiobjective optimization
dc.subjectreliability
dc.subjecttabu search
dc.titleA Multiobjective Model for Distribution System Planning based on Tabu Search