dc.contributorUniversidade Estadual Paulista (Unesp)
dc.date.accessioned2019-10-04T12:41:09Z
dc.date.accessioned2022-12-19T18:14:31Z
dc.date.available2019-10-04T12:41:09Z
dc.date.available2022-12-19T18:14:31Z
dc.date.created2019-10-04T12:41:09Z
dc.date.issued2018-01-01
dc.identifier26th Iranian Conference On Electrical Engineering (icee 2018). New York: Ieee, p. 1005-1010, 2018.
dc.identifier2164-7054
dc.identifierhttp://hdl.handle.net/11449/186084
dc.identifierWOS:000482783300188
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/5367136
dc.description.abstractThis study investigates the economic and reliability effects of line maintenance on composite transmission and generation expansion planning, considering the reliability of transmission and generation systems. The aim is to find a compromise among the expansion costs of the transmission and generation systems, power system reliability, and the maintenance cost of transmission lines. To do so, the reliability of the transmission system is modeled using load shedding (LS) due to line outages, and the reliability of the generation system is calculated using the loss of load (LOL) and LS criteria due to generating unit outages and transmission congestion. The proposed model was tested on the IEEE Reliability Test System (IEEE RTS). The paper includes a discussion of the results.
dc.languageeng
dc.publisherIeee
dc.relation26th Iranian Conference On Electrical Engineering (icee 2018)
dc.rightsAcesso aberto
dc.sourceWeb of Science
dc.subjectGeneration expansion planning
dc.subjectmaintenance
dc.subjectreliability
dc.subjecttransmission expansion planning
dc.titleTransmission and Generation Expansion Planning Considering System Reliability and Line Maintenance