dc.contributorBautista Ríos, Juan Pablo
dc.creatorLaguna Runser, Víctor Román
dc.creatorLaguna Runser, Víctor Román
dc.date2022-07-12T18:40:45Z
dc.date2022-07-12T18:40:45Z
dc.date2021
dc.date.accessioned2022-12-06T22:24:09Z
dc.date.available2022-12-06T22:24:09Z
dc.identifierhttp://hdl.handle.net/20.500.14076/22367
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/5295608
dc.descriptionEl presente trabajo de Tesis consistió en desarrollar un estudio detallado para incrementar la potencia de una línea de transmisión de energía eléctrica existente, en 60 kV, haciendo el cambio del conductor de Cobre original por uno de Aleación de Aluminio de mayor sección transversal, pero con peso unitario similar al original, y manteniendo el trazo y estructuras de soporte existentes. Dicho incremento en potencia responde a una proyección de la demanda en aumento. Es este incremento de la sección transversal el responsable de poder aumentar la ampacidad del conductor lo que se traduce en aumento de la cantidad de corriente transportable, por ende, la consecución del aumento de potencia. Se analizó el efecto de este nuevo conductor sobre las estructuras de soporte existentes, tanto en capacidad de carga como en ubicación, para verificar si eran utilizables respetando los factores de seguridad correspondientes a una línea nueva, pero incorporando cierto grado de reducción de dichas capacidades por el tiempo en servicio transcurrido entre su instalación y el momento de este estudio. Todo esto manteniendo la franja de servidumbre correspondiente o incluyendo variantes en tramos donde esta franja ha sido afectada por el desarrollo urbano vecino a la línea. Finalmente, se proponen criterios de ejecución para esta repotenciación.
dc.descriptionThis work developed a study to increase the power capacity from an existing transmission line, in 60 kV, by changing the original Cupper conductor for a new one of All Aluminum Alloy with wider cross section, keeping a pretty similar unit weight than the original, and respecting existing line’s path and structures. This power increase will respond to an increasing power supply demand. This wider cross section is the key element to increase the ampacity of the line’s conductor which translate into an increment in the current that can be transported, leading to an increased power transmission capacity of the line. It was analyzed the impact of this new conductor over existing structures, from the loading and location points of view, to verify that they can be used respecting proper safety factors for a brand new line, but considering some reduction in theirs original loading capacities, due to the exposure time since the moment this line was installed to the moment when this study was performed. All this study was done considering keeping as much as the original service route as possible, but if necessary, to include some variations where the service route has been affected by the urban development around the line. Finally, it is proposed some execution criteria to achieve this power upgrade.
dc.descriptionTesis
dc.formatapplication/pdf
dc.languagespa
dc.publisherUniversidad Nacional de Ingeniería
dc.publisherPE
dc.rightsinfo:eu-repo/semantics/restrictedAccess
dc.rightshttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourceUniversidad Nacional de Ingeniería
dc.sourceRepositorio Institucional - UNI
dc.subjectLíneas de transmisión
dc.subjectRepotenciación
dc.subjecthttp://purl.org/pe-repo/ocde/ford#2.02.01
dc.titleIncremento de la potencia de una línea de transmisión en 60 kv. aplicación a un caso en el departamento de Piura
dc.typeTesis


Este ítem pertenece a la siguiente institución