dc.contributorRomano, Cezar Augusto
dc.contributorCordeiro, Arildo Dirceu
dc.creatorChibinski, Murilo
dc.date.accessioned2013-09-16T18:35:12Z
dc.date.accessioned2022-12-06T15:38:58Z
dc.date.available2013-09-16T18:35:12Z
dc.date.available2022-12-06T15:38:58Z
dc.date.created2013-09-16T18:35:12Z
dc.date.issued2012-12-07
dc.identifierCHIBINSKI, Murilo. Modelo de planejamento baseado no conceito do last planner como apoio à implementação da lean construction em obras de edificações. 2012. 191 f. Dissertação (Mestrado em Engenharia Civil) - Universidade Tecnológica Federal do Paraná, Curitiba, 2012.
dc.identifierhttp://repositorio.utfpr.edu.br/jspui/handle/1/585
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/5268744
dc.description.abstractThe Lean Construction (Lightweight Construction) is a construction philosophy that seeks to reduce the resources needed for the production and the optimization of production processes. The growth of the construction industry, the shortage of manpower and equipment and the need for programming of materials in advance, are reasons that encourage the search for a planning model that allows the reading of the strategic operational plan information. The goal is to demonstrate that a planning model developed with actions and targeted planning techniques by the Last Planner (planning) contribute in the implementation of Lean Construction. With pre supposed that these techniques, when applied, can result in the reduction of time, labour and cost. The search here was exposed through a theoretical and exploratory research method seeking to create a planning model that establishes a clear view of the hierarchy of different levels of management in planning contributes to increased efficiency of the planning system, since the sector has adapted concepts, methods and techniques of industrial environments that differ from the context of the activity that gave rise to the technique just producing a system inadequate and low effectiveness. The planning model formed through a WBS (work breakdown structure project partition), organised in work packages and ordered by the Executive of the sequence, as recommended by the Last Planner, allows the identification of processing activities and workflow, enabling the application of lean production systems. Using a planning System the same EAP budgeting process to work planning, information float from strategic to operational allowing real time get the cash flow of the work, the scheduling of resources and "S" curves of physical and financial monitoring. Through monitoring of the work and the feedback loop of planning, these "S" curves and resource schedules would be altered, depending on the progress of the work, through a single systemic process, the feedback loop of the progress of the work on the physical plan.
dc.publisherUniversidade Tecnológica Federal do Paraná
dc.publisherCuritiba
dc.publisherPrograma de Pós-Graduação em Engenharia Civil
dc.subjectConstrução civil - Planejamento
dc.subjectControle de produção
dc.subjectEstrutura analítica de projetos
dc.subjectAgenda de execução (Administração)
dc.subjectPlanejamento estratégico
dc.subjectConstrução civil - Controle de qualidade
dc.subjectBuilding - Planning
dc.subjectProduction control
dc.subjectWork breakdown structure
dc.subjectScheduling (Management)
dc.subjectStrategic planning
dc.subjectBuilding - Quality control
dc.titleModelo de planejamento baseado no conceito do last planner como apoio à implementação da lean construction em obras de edificações
dc.typemasterThesis


Este ítem pertenece a la siguiente institución