dc.contributorColmenero, João Carlos
dc.contributorhttp://lattes.cnpq.br/0149134194151779
dc.contributorVieira, Gulherme Ernani
dc.contributorOliveira, Ivanir Luiz de
dc.contributorHatakeyama, Kazuo
dc.contributorColmenero, João Carlos
dc.creatorTomelin, Mauricio
dc.date.accessioned5000-01-01
dc.date.accessioned2018-12-01T19:40:27Z
dc.date.accessioned2022-12-06T15:27:58Z
dc.date.available5000-01-01
dc.date.available2018-12-01T19:40:27Z
dc.date.available2022-12-06T15:27:58Z
dc.date.created5000-01-01
dc.date.created2018-12-01T19:40:27Z
dc.date.issued2008-08-11
dc.identifierTOMELIN, Mauricio. Metodologia baseada em dados históricos para definição de layouts em sistemas job-shop. 2008. 82 f. Dissertação (Mestrado em Engenharia da Produção) - Universidade Tecnológica Federal do Paraná, Ponta Grossa, 2008.
dc.identifierhttp://repositorio.utfpr.edu.br/jspui/handle/1/3665
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/5266175
dc.description.abstractThis paper proposes a methodology for a job-shop layout definition. Commonly, the job-shop layout problems are solved by applying the pooling of the production resources through a cellular structure. This structure is to pool the resources to process a particular product, been careful for not combine resources with the same function in the same manufacturing cell. Resources can be pooled to create sectors similarity with the same function and products visit these sectors to receive the necessary processing. In both cases the true product processing purpose is distorted and the goal becomes to use a combination of available resources. The proposed methodology was applied to a three years data period collected in a machining company. The parameters used were the total sales, the sales frequency, profitability, the total processing time and stand by time from each product, generating the products classification. The production path was compared and according to the parameters the importance degree of each link made between resources was determined based on the products importance degree. The comparison of the paths was done in ways to quantify the same routes and quantify the route differences, generating similar routes. The links were subjected to a mathematical model that determined each feature position in the layout. The developed methodology was applied to a machining company data that presents a job-shop character. The company's data submitted to the methodology enabled the development of a layout suggestion which main goal is to minimize the distance of products processing resources.
dc.publisherUniversidade Tecnológica Federal do Paraná
dc.publisherPonta Grossa
dc.publisherBrasil
dc.publisherPrograma de Pós-Graduação em Engenharia de Produção
dc.publisherUTFPR
dc.rightsembargoedAccess
dc.subjectInstalações industriais - Layout
dc.subjectModelos matemáticos
dc.subjectBalanceamento de linha de montagem
dc.subjectUsinagem
dc.subjectPlant layout
dc.subjectMathematical models
dc.subjectAssembly-line balancing
dc.subjectMachining
dc.titleMetodologia baseada em dados históricos para definição de layouts em sistemas job-shop
dc.typemasterThesis


Este ítem pertenece a la siguiente institución