dc.contributorRigoni, Emerson
dc.contributorMello Neto, Ernesto Furtado de
dc.contributorRigoni, Emerson
dc.contributorRodrigues, Marcelo
dc.contributorParis, Wanderson Stael
dc.creatorSantana, Fabiano Candido
dc.date.accessioned2020-11-23T11:57:49Z
dc.date.accessioned2022-12-06T14:47:32Z
dc.date.available2020-11-23T11:57:49Z
dc.date.available2022-12-06T14:47:32Z
dc.date.created2020-11-23T11:57:49Z
dc.date.issued2019-10-04
dc.identifierSANTANO, Fabiano Candido. Definição dos intervalos ótimos de manutenção preventiva de um laminador desbastador. 2019. Trabalho de Conclusão de Curso Especialização em Engenharia da Confiabilidade) – Universidade Tecnológica Federal do Paraná, Curitiba, 2019.
dc.identifierhttp://repositorio.utfpr.edu.br/jspui/handle/1/18630
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/5255904
dc.description.abstractThe reliability of each asset is already defined at the moment of its conception, that is, each equipment has a "DNA" depending on its design and assumptions. Thus, after the commissioning and in full operation, the scenarios change and the managers with their teams are challenged to maintain the high performance of these assets, but with new operating modes most of the time. This work will define the optimal intervals for preventive maintenance of an equipment, addressing some quantitative reliability engineering methodologies. Consisting of two phases, the first made the analysis of the systems that make up the Roughing Mill of ArcelorMittal Tubarão, showing a 98% availability with about 1,200 failures, allowing the selection of two more critical systems, the Horizontal Roughing Mill and the De-scaling Primary unit. That done, these two systems were detailed and reanalyzed at component level or LRU - Lowest Replaceable Unit. Thus, with RAM - Reliability, Availability and Maintenability analysis, the optimal preventive maintenance intervals of 115 LRU's were estimated, considering the basic tripod of cost, risk and performance.
dc.publisherUniversidade Tecnológica Federal do Paraná
dc.publisherCuritiba
dc.publisherBrasil
dc.publisherEspecialização em Engenharia da Confiabilidade
dc.publisherUTFPR
dc.rightsopenAccess
dc.subjectConfiabilidade (Engenharia)
dc.subjectMantenabilidade (Engenharia)
dc.subjectManutenção
dc.subjectLaminação (Metalurgia)
dc.subjectReliability (Engineering)
dc.subjectMaintainability (Engineering)
dc.subjectMaintenance
dc.subjectRolling (Metal-work)
dc.titleDefinição dos intervalos ótimos de manutenção preventiva de um laminador desbastador
dc.typespecializationThesis