dc.contributorCosta, Carlos Alberto da
dc.contributorCosta, Carlos Alberto da
dc.contributorAlberti, Mauro Edson
dc.contributorRomano, Cezar Augusto
dc.creatorBarros, Diogo
dc.creatorSilva, Guilherme Asinelli
dc.date.accessioned2020-11-11T13:25:04Z
dc.date.accessioned2022-12-06T14:40:56Z
dc.date.available2020-11-11T13:25:04Z
dc.date.available2022-12-06T14:40:56Z
dc.date.created2020-11-11T13:25:04Z
dc.date.issued2018-06-25
dc.identifierBARROS, Diogo; SILVA, Guilherme Asinelli. Relações entre o BIM 4D e o método de planejamento de tempos tradicional em um modelo residencial: estudo de caso. 2018. 78 f. Trabalho de Conclusão de Curso (Graduação em Engenharia Civil) - Universidade Tecnológica Federal do Paraná, Curitiba, 2018.
dc.identifierhttp://repositorio.utfpr.edu.br/jspui/handle/1/8106
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/5253890
dc.description.abstractNowadays in the field of Civil Construction, the only way to visualize the traditional method of time management is through the Gantt diagram, which is comped by bars, that represent the duration of the activities of the work, and arrows, which indicates the precedences. With that tool it is made possible to see the stages of the work while it develops, but with some limitations. As a visual alternative, the promissor Building Information Modeling, BIM, conveniently used as a 3D project’s compatibility tool, obtains a new dimension, the 4D, when added a predefined work schedule within the model. The methodology of this academic work tries to comprehend the similarities between these methods of time management by studying a case study - an unifamiliar BIM model with integrated executive projects provided by a specialized project management’s company. Conclusively, the BIM process needs the traditional time management methods to create a schedule of the work and with that the simulations are able to be made to help the planner with a virtual animation of the defined schedule. New research and study’s ideas are being developed for the computerized process regarding work’s monitoring through the BIM’s philosophy, as well as the other dimensions available in the process.
dc.publisherUniversidade Tecnológica Federal do Paraná
dc.publisherCuritiba
dc.publisherBrasil
dc.publisherGraduação em Engenharia Civil
dc.publisherUTFPR
dc.rightsrestrictAccess
dc.subjectModelagem de informação da construção
dc.subjectConstrução civil - Planejamento
dc.subjectModelagem
dc.subjectAdministração de projetos
dc.subjectEngenharia civil
dc.subjectBuilding information modeling
dc.subjectBuilding - Planning
dc.subjectModelyng
dc.subjectProject management
dc.subjectCivil engineering
dc.titleRelações entre o BIM 4D e o método de planejamento de tempos tradicional em um modelo residencial: estudo de caso
dc.typebachelorThesis