dc.contributorMarçal, Rui Francisco Martins
dc.contributorhttp://lattes.cnpq.br/5542917168861854
dc.contributorAlencar, Luciana Hazin
dc.contributorKovaleski, João Luiz
dc.contributorKaster, Mauricio dos Santos
dc.contributorMarçal, Rui Francisco Martins
dc.creatorGuimarães, Marcio Bonatto
dc.date.accessioned5000-01-01
dc.date.accessioned2018-11-29T14:30:04Z
dc.date.accessioned2022-12-06T14:13:04Z
dc.date.available5000-01-01
dc.date.available2018-11-29T14:30:04Z
dc.date.available2022-12-06T14:13:04Z
dc.date.created5000-01-01
dc.date.created2018-11-29T14:30:04Z
dc.date.issued2007-12-18
dc.identifierGUIMARÃES, Marcio Bonatto. Reflexos do planejamento da manutenção na produção e rentabilidade em usinas de geração de energia elétrica. 2007. 77 f. Dissertação (Mestrado em Engenharia da Produção) - Universidade Tecnológica Federal do Paraná, Ponta Grossa, 2007.
dc.identifierhttp://repositorio.utfpr.edu.br/jspui/handle/1/3602
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/5243835
dc.description.abstractThis paper describes the institutional alterations that have occurred due the new model of organization of the power industry, especially in identifying their impact on generation companies. The study highlights the influences of the new model on maintenance planning, penalties due the unavailability of the power plant and the impacts of the ups and downs of the production and the power market on costs and earnings of the companies. It evaluates the impacts of the hydrological conditions, of the Energy Replacement Mechanism - MRE and the Differences Liquidation Price - PLD on the earnings as well as on the schedule for programmed maintenance. The methodology used was research “ex-post-facto”. It utilizes data from a generation company database. It simulates the calculation in order to verify the impact of the aspects not considered in the maintenance planning, the prevision on equipment availability and on profitability. Finally, based on the results of the calculation comes up the decision criteria on the intervention schedule in order to: optimize the relation production X earnings, accept regulation of the National Energy Office, not putting at risk the equipment lifetime.
dc.publisherUniversidade Tecnológica Federal do Paraná
dc.publisherPonta Grossa
dc.publisherBrasil
dc.publisherPrograma de Pós-Graduação em Engenharia de Produção
dc.publisherUTFPR
dc.rightsembargoedAccess
dc.subjectAdministração da produção
dc.subjectEnergia elétrica - Produção
dc.subjectManutenção
dc.subjectPlanejamento
dc.subjectProduction management
dc.subjectElectric power production
dc.subjectMaintenance
dc.subjectPlanning
dc.titleReflexos do planejamento da manutenção na produção e rentabilidade em usinas de geração de energia elétrica
dc.typemasterThesis