dc.contributorEusebio Antonio, Araujo
dc.creatorGarcia Ruiz, Antony Robert
dc.date.accessioned2022-10-21T19:11:36Z
dc.date.accessioned2022-10-24T19:22:51Z
dc.date.available2022-10-21T19:11:36Z
dc.date.available2022-10-24T19:22:51Z
dc.date.created2022-10-21T19:11:36Z
dc.date.issued2022-10
dc.identifierhttp://dspace.unitru.edu.pe/handle/UNITRU/20312
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/4754358
dc.description.abstractEn la Mina Antapite se viene presentando problemas de inestabilidad en el avance de las labores como la formación de cuñas de gran tonelaje utilizándose para el sostenimiento pernos split set, pero debido a su baja capacidad de anclaje y susceptibilidad a la corrosión no garantiza la estabilidad de las labores tanto para personal y equipos, lo que es posible lograr con la adición de cartuchos de resina - cemento en la instalación de pernos split set. El objetivo del estudio es determinar el incremento de la capacidad de anclaje de los pernos split set de 5 pies empleando cartuchos de resina – cemento en el avance del by pass 415; aplicando las técnicas de recolección de datos mediante la revisión documental (revisión de fuentes bibliográficas) y observación directa (mapeo geomecánico y pruebas de tracción), los resultados se alcanzaron al realizar 30 pruebas de tracción con split set sin cartuchos de resina – cemento, se obtuvo una capacidad de anclaje promedio de 6 toneladas y un rendimiento promedio de 1.2 toneladas/pie. De las 30 pruebas de tracción restantes realizadas en split set con cartuchos de resina – cemento, se obtuvo una capacidad de anclaje promedio de 10.5 toneladas y un rendimiento promedio de 2.1 toneladas/pie. Se concluye que con la adicion de cartuchos de resina – cemento en el sostenimiento con split set se logró incrementar la capacidad de anclaje superior a 70%.
dc.description.abstractIn the Antapite Mine, problems of instability have been presented in the progress of the work, such as the formation of large tonnage wedges, using split set bolts for support, but due to its low anchoring capacity and susceptibility to corrosion, it does not guarantee the stability of the mine. the work for both personnel and equipment, which is possible with the addition of resincement cartridges in the installation of split set bolts. The objective of the study is to determine the increase in the anchoring capacity of the 5-foot split set bolts using resin - cement cartridges in the advancement of the 415 bypass; Applying data collection techniques through documentary review (review of bibliographic sources) and direct observation (geomechanical mapping and pull tests), the results were achieved by performing 30 pull tests with split set without resin-cement cartridges. obtained an average anchoring capacity of 6 tons and an average yield of 1.2 tons/ft. Of the remaining 30 pull tests carried out in a split set with resin-cement cartridges, an average anchorage capacity of 10.5 tons and an average yield of 2.1 tons/ft were obtained. It is concluded that with the addition of resin -cement cartridges in the support with split set, it was possible to increase the anchoring capacity of more than 70%
dc.languagespa
dc.publisherUniversidad Nacional de Trujillo
dc.publisherPE
dc.rightshttp://creativecommons.org/licences/by-nc-sa/2.5/pe/
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectanclaje de pernos split set con resina-cemento
dc.titleIncremento de capacidad de anclaje de pernos split set con resina-cemento en by pass 415 Mina Antapite
dc.typeinfo:eu-repo/semantics/bachelorThesis


Este ítem pertenece a la siguiente institución