dc.contributorCotrina Teatino, Marco Antonio
dc.creatorRodriguez Roncales, Elman Jheran
dc.date.accessioned2021-11-06T03:55:38Z
dc.date.accessioned2022-10-24T19:03:22Z
dc.date.available2021-11-06T03:55:38Z
dc.date.available2022-10-24T19:03:22Z
dc.date.created2021-11-06T03:55:38Z
dc.date.issued2021-11
dc.identifierhttp://dspace.unitru.edu.pe/handle/UNITRU/18225
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/4748268
dc.description.abstractEl objetivo más importante de esta investigación fue analizar el factor de acoplamiento en el ciclo de carguío y acarreo para incrementar su producción y reducir el costo unitario en la contrata TRA S.A.C. – SUMMA Gold S.A.C. La metodología que siguió fue elegir y constituir la investigación coleccionada del registro de tiempos de las unidades de carguío y transporte con la intención de instaurar el factor de acoplamiento óptimo. Posterior a un análisis se logró establecer el factor óptimo el cual, redujo el costo unitario y aumentó la producción. El estudio presenta un diseño descriptivo y aplicada según su finalidad, las variables dependientes fueron producción mina y costo unitario, la variable independiente fue el factor de acoplamiento. El óptimo factor de acoplamiento para el ciclo de carguío y acarreo fue de 1.03, con un número adecuado de camiones para la extracción del mineral de15. La producción mensual aumentó debido a la optimización del factor de acoplamiento. La producción en los meses de mayo, junio y julio aumento en 28.53, 33.62 y 22.18 t/h, respectivamente, cuyo incremento fue de 4.64, 5.47 y 3.62 %. Así mismo los costos unitarios en promedio mensual en el ciclo de carguío y acarreo se redujeron, en 0.017, 0.020, 0.013 $/t representando el 4.64, 5.47 y 3.62 %; respectivamente.
dc.description.abstractThe main objective of this research was to analyze the coupling factor in the loading and hauling cycle to increase its production and reduce the unit cost in the TRA S.A.C. - SUMMA Gold S.A.C. The next step was to select and organize the information collected from the time control of the loading and transportation equipment in order to establish the optimal coupling factor. Later an analysis was able to establish the optimal factor which reduced the unit cost and increased production. The study presents a descriptive design and applied according to its purpose, the dependent variables were mine production and unit cost, the independent variable was the coupling factor. The optimal coupling factor for the loading and hauling cycle was 1.03, with an adequate number of trucks for the extraction of the mineral 15. The monthly production increased due to the optimization of the coupling factor. Production in the months of May, June and July increased by 28.53, 33.62 and 22.18 t / h, respectively, whose increase was 4.64, 5.47 and 3.62%. Likewise, the unit costs in monthly average in the loading and hauling cycle were reduced by 0.017, 0.020, 0.013 $ / t representing 4.64, 5.47 and 3.62%; respectively.
dc.languagespa
dc.publisherUniversidad Nacional de Trujillo
dc.publisherUniversidad Nacional de Trujillo
dc.publisherPE
dc.rightsCreative Commons
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectfactor de acoplamiento sobre la producción y el costo unitario
dc.titleAnálisis del factor de acoplamiento sobre la producción y el costo unitario en el ciclo de carguío y acarreo en la contrata TRA S.A.C. - Summa Gold S.A.C., 2020
dc.typeinfo:eu-repo/semantics/bachelorThesis


Este ítem pertenece a la siguiente institución