dc.contributor | Aguilar Briones, Elmer | |
dc.creator | Velasquez Diaz, Yoshting | |
dc.date.accessioned | 2019-03-07T00:32:20Z | |
dc.date.accessioned | 2022-10-24T16:19:44Z | |
dc.date.available | 2019-03-07T00:32:20Z | |
dc.date.available | 2022-10-24T16:19:44Z | |
dc.date.created | 2019-03-07T00:32:20Z | |
dc.date.issued | 2019-02-21 | |
dc.identifier | Velasquez, Y. (2019). Propuesta de mejora del sistema logistico para disminuir los costos de desabastecimiento de repuestos de maquinaria excavadora en Grupo Cajamarca Minería y Construcción S.A.C (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/15068 | |
dc.identifier | 670.7 VELA 2019 | |
dc.identifier | https://hdl.handle.net/11537/15068 | |
dc.identifier.uri | https://repositorioslatinoamericanos.uchile.cl/handle/2250/4727392 | |
dc.description.abstract | RESUMEN
El tema de costos por desabastecimiento generados por ruptura de stock es un tema que toma
gran importancia dentro del sistema logístico en las empresas en la actualidad, debido a esto
se ha realizado diferentes estudios con la finalidad de minimizar dichos costos, puesto que
en nuestro país las empresas de servicios de maquinaria pesada presenta un gran déficit al
momento de los mantenimientos, al no contar con los repuestos necesarios para su ejecución
generando faltantes y cuellos de botella en operación, lo que conlleva a penalidades por
incumplimiento, esto se debe a no contar con estrategias capaces de minimizar dicho
problema. De esta forma en nuestro plan de trabajo tenemos como objetivo mejorar el
sistema logístico para reducir dichos costos usando herramientas capaces de predecir la
demanda de repuestos de excavadoras para su mantenimiento, para ello usamos pronósticos
a corto y largo plazo según por (Muñoz Valenzuela, 2011), modelo ABC Multicriterio
recomendada por Rojas & Castañeda (2015), modelo EOQ y punto de reorden (ROP) según
Causado (2015), luego de estimar dichos resultados este afecta de forma directa a los costos
de desabastecimiento de repuestos en donde obtuvimos una reducción de 14% en los ítems
de rotura de stock, 23 % de disminución en nivel de incumplimiento de despacho y un ahorro
total de costos de rotura de stock valorizado en S/.148,897.83.
PALABRAS CLAVES: Costos, desabastecimiento, logística, mantenimiento, stock, despacho,
reorden, EOQ, etc. | |
dc.description.abstract | ABSTRACT
The issue of costs due to shortages generated by breakdown of stock is a topic that takes
great importance within the logistics system in companies today, due to this has been carried
out different studies in order to minimize these costs, since in our country heavy machinery
service companies have a large deficit at the time of maintenance, not having the necessary
spare parts for its execution generating shortages and bottlenecks in operation, which leads
to penalties for non-compliance, this is due to not having with strategies capable of
minimizing this problem. Thus, in our work plan we aim to improve the logistics system to
reduce these costs using tools capable of predicting the demand for excavator spare parts for
maintenance, for this we use short and long term forecasts according to Muñoz (2011),
Multicriteria ABC model recommended by Rojas & Castañeda (2015), EOQ model and
reorder point (ROP) according to Cause (2015), after estimating these results, this directly
affects the costs of shortages of spare parts where we obtained a reduction of 14% in items
of stock breakage, 23% decrease in the level of breach of delivery and a total saving of stock
breakage costs valued at S /. 148,897.83. | |
dc.language | spa | |
dc.publisher | Universidad Privada del Norte | |
dc.publisher | PE | |
dc.rights | https://creativecommons.org/licenses/by-nc-sa/2.5/pe/ | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.source | Universidad Privada del Norte | |
dc.source | Repositorio Institucional - UPN | |
dc.subject | Costos de producción | |
dc.subject | Mantenimiento y reparación | |
dc.subject | Ingeniería industrial | |
dc.title | Propuesta de mejora del sistema logistico para disminuir los costos de desabastecimiento de repuestos de maquinaria excavadora en Grupo Cajamarca Minería y Construcción S.A.C | |
dc.type | info:eu-repo/semantics/bachelorThesis | |